共 50 条
- [1] SELBY DIVERSION OF THE EAST-COAST MAIN LINE - CONSTRUCTION - DISCUSSION [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 537 - 552
- [2] SELBY DIVERSION OF THE EAST COAST MAIN LINE - CONSTRUCTION [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (FEB): : 49 - 84
- [3] SELBY DIVERSION OF THE EAST COAST MAIN LINE .1. THE BACKGROUND AND STUDY OF ALTERNATIVES .2. ROUTE DESIGN .3. BRIDGES [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1983, 74 (NOV): : 719 - 747
- [5] POWER REMOTE-CONTROL - EAST COAST MAIN LINE [J]. INTERNATIONAL CONFERENCE ON MAIN LINE RAILWAY ELECTRIFICATION, 1989, 312 : 311 - 316
- [6] EAST COAST MAIN LINE - ELECTRIFICATION FIXED EQUIPMENT MAINTENANCE [J]. INTERNATIONAL CONFERENCE ON MAIN LINE RAILWAY ELECTRIFICATION, 1989, 312 : 134 - 138
- [8] CLIFF SLOPE FAILURE AT CATCAIRN BUSHES NEAR BURNMOUTH ON THE EAST-COAST MAIN LINE, MAY 1983 - DISCUSSION [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 243 - 249
- [10] ELECTRIFICATION OF BRITISH RAILWAYS EAST COAST MAIN LINE - THE PROJECT AND ITS MANAGEMENT [J]. INTERNATIONAL CONFERENCE ON MAIN LINE RAILWAY ELECTRIFICATION, 1989, 312 : 1 - 6