共 19 条
- [1] ASTRA - Automated sensor burial tool for set-up of subsea seismic networks [J]. PROCEEDINGS OF THE THIRTEENTH (2003) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2003, : 221 - 227
- [2] FAST BEAM CHAMBERS OF THE SET-UP ISTRA-M [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1994, 351 (2-3): : 345 - 348
- [3] Unreliable M/M/1/1 retrial queues with set-up time [J]. QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2018, 15 (05): : 589 - 601
- [4] Test of experimental set-up for reflectance measurement at wavelengths 1.06 and 10.6 μm [J]. LASER-INDUCED DAMAGE IN OPTICAL MATERIALS: 1997, PROCEEDINGS, 1998, 3244 : 386 - 389
- [6] Fluid Model Driven by an M/M/1 Queue with Set-up and Close-down Period [J]. APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 3377 - 3380
- [7] M/M/1 queue of working vacations with set-up time N-policy and negative customers [J]. Jiangsu Daxue Xuebao Ziran Kexue Ban J. Jiangsu Univ. Nat. Sci. Ed., 2012, 5 (616-620):
- [10] High Al-doping of SiC using a modified PVT (M-PVT) growth set-up [J]. SILICON CARBIDE AND RELATED MATERIALS 2004, 2005, 483 : 31 - 34