SGS-THOMSON JOINS CHINESE FIRM IN SEMICON BACK-END MANUFACTURING

被引:0
|
作者
VOLLMER, A
机构
来源
ELECTRONICS-US | 1994年 / 67卷 / 21期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:13 / 13
页数:1
相关论文
共 15 条
  • [1] AUTONOMOUS SCHEDULING IN SEMICONDUCTOR BACK-END MANUFACTURING
    Adan, Jelle
    Akcay, Alp
    Fowler, John
    Albers, Marc
    Geurtsen, Michael
    2022 WINTER SIMULATION CONFERENCE (WSC), 2022, : 3489 - 3500
  • [2] Scheduling Back-End Operations in Semiconductor Manufacturing
    Deng, Yumin
    Bard, Jonathan F.
    Chacon, G. Rodolfo
    Stuber, John
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (02) : 210 - 220
  • [3] Practical lot release methodology for semiconductor back-end manufacturing
    Liu, W
    Chua, TJ
    Cai, TX
    Wang, FY
    Yan, WJ
    PRODUCTION PLANNING & CONTROL, 2005, 16 (03) : 297 - 308
  • [4] Virtual production lines design for back-end semiconductor manufacturing systems
    Tang, Y
    Zhou, MC
    Qiu, RG
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2003, 16 (03) : 543 - 550
  • [5] An approach to regulating machine sharing in reconfigurable back-end semiconductor manufacturing
    Robin G. Qiu
    Sanjay Joshi
    Patrick McDonnell
    Journal of Intelligent Manufacturing, 2004, 15 : 579 - 591
  • [6] Design for business: Advancing the business culture of semiconductor back-end manufacturing
    Carrasco, Andres
    Kayama, Masayuki
    ISSM 2006 CONFERENCE PROCEEDINGS- 13TH INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, 2006, : 211 - 214
  • [7] Design of virtual production lines in back-end semiconductor manufacturing systems
    Tang, Y
    Zhou, MC
    Qiu, RB
    SMC 2000 CONFERENCE PROCEEDINGS: 2000 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOL 1-5, 2000, : 1733 - 1738
  • [8] An approach to regulating machine sharing in reconfigurable back-end semiconductor manufacturing
    Qiu, RG
    Joshi, S
    McDonnell, P
    JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (05) : 579 - 591
  • [9] Design Dependent Process Monitoring for Back-end Manufacturing Cost Reduction
    Chan, Tuck-Boon
    Pant, Aashish
    Cheng, Lerong
    Gupta, Puneet
    2010 IEEE AND ACM INTERNATIONAL CONFERENCE ON COMPUTER-AIDED DESIGN (ICCAD), 2010, : 116 - 122
  • [10] Effective implementation of cycle time reduction strategies for semiconductor back-end manufacturing
    Domaschke, J
    Brown, S
    Robinson, J
    Leibl, F
    1998 WINTER SIMULATION CONFERENCE PROCEEDINGS, VOLS 1 AND 2, 1998, : 985 - 992