共 16 条
- [1] BEHAVIOR OF A PROPPED EMBEDDED RETAINING WALL AT BELL COMMON TUNNEL IN THE LONGER TERM [J]. GEOTECHNIQUE, 1989, 39 (04): : 701 - 710
- [3] THE EFFECT OF WALL STIFFNESS ON THE BEHAVIOR OF A PROPPED RETAINING WALL [J]. GEOTECHNIQUE, 1985, 35 (03): : 347 - 352
- [4] Design of low-propped embedded retaining walls in stiff clays [J]. GROUND ENGINEERING, 1996, 29 (08): : 37 - 41
- [5] LONG-TERM PERFORMANCE OF AN EMBEDDED CANTILEVER RETAINING WALL IN STIFF CLAY [J]. GEOTECHNIQUE, 1989, 39 (01): : 55 - 75
- [6] ASSESSING THE STABILITY OF A PROPPED, INSITU RETAINING WALL IN OVERCONSOLIDATED CLAY [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 2-RESEARCH AND THEORY, 1983, 75 (DEC): : 617 - 633
- [7] THE BEHAVIOR OF A PROPPED RETAINING WALL - RESULTS OF A NUMERICAL EXPERIMENT [J]. GEOTECHNIQUE, 1984, 34 (03): : 383 - 404
- [8] THE BEHAVIOR OF A PROPPED RETAINING WALL - RESULTS OF A NUMERICAL EXPERIMENT - DISCUSSION [J]. GEOTECHNIQUE, 1986, 36 (01): : 119 - 121
- [9] Centrifuge model tests on doubly propped embedded retaining walls in overconsolidated kaolin clay [J]. GEOTECHNIQUE, 1998, 48 (06): : 833 - 846
- [10] Behavior of the earth pressure acting on a retaining wall in a multi-propped excavation [J]. COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 3, 1997, : 1925 - 1929