We consider the static single-facility scheduling problem where the processing times of jobs are a nondecreasing and differentiable function of their starting (waiting) times and the objective is to minimize the total elapsed time (makespan) in which all jobs complete their processing. We give a criterion for optimality of two jobs to be scheduled next to each other, and based on this criterion we propose a heuristic algorithm to solve the problem. The effectiveness of the algorithm is empirically evaluated for quadratic and exponential cost functions. In the quadratic case it is compared with the static heuristic algorithm proposed by Gupta and Gupta.
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
Zhengzhou Univ, Dept Math, Zhengzhou 450001, Henan, Peoples R ChinaHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
Lu, Lingfa
Ng, C. T.
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R ChinaHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
Ng, C. T.
Zhang, Liqi
论文数: 0引用数: 0
h-index: 0
机构:
Zhengzhou Univ, Dept Math, Zhengzhou 450001, Henan, Peoples R ChinaHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China