Project risk analysis based on project characteristics

被引:14
|
作者
Shishodia, Anjali [1 ]
Dixit, Vijaya [2 ]
Verma, Priyanka [1 ]
机构
[1] Natl Inst Ind Engn, Mumbai, Maharashtra, India
[2] Indian Inst Management Ranchi, Ranchi, Bihar, India
关键词
Technology; Project risk management; New product development; Engineering and construction; Risk classification; Information system; information technology; Novelty; Complexity; Pace model;
D O I
10.1108/BIJ-06-2017-0151
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to analyze risk profiles of projects based on project characteristics and provide key managerial insights. Design/methodology/approach A total of 37 project cases from engineering and construction (E&C), information system/technology (IS/IT), and new product development (NPD) sectors with detailed information on project characteristics and risks were identified from published literature. An integrated framework was developed to analyze the prominent risk categories associated with novelty, technology, complexity, and pace (NTCP) project characteristics. Findings Within-sector analysis revealed that schedule, resource, and scope risks are the most prominent risk categories in E&C, IS/IT, and NPD projects, respectively. Similarly, interesting key insights have been drawn from detailed cross-sector analysis, depicting different risk categories based on NTCP project characteristics. Research limitations/implications The findings are based on the case studies adopted from the literature that provides details of project characteristics and risk profiles. Practical implications Depending upon the risks associated with different project characteristics, an integrated framework developed in the study can be used for the development of highly authentic risk management plans at the onset. Originality/value This is one of the earliest studies to provide an integrated risk framework for projects based on their NTCP characteristics. The two contrasting perspectives of within-sector and cross-sector analyses were adopted. Overall, the study will enhance the future preparedness toward risks.
引用
下载
收藏
页码:893 / 918
页数:26
相关论文
共 50 条
  • [1] Project characteristics, project management software utilization and project performance: An impact analysis based on real project data
    Pellerin, Robert
    Perrier, Nathalie
    Guillot, Xavier
    Leger, Pierre-Majorique
    IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2013, 1 (03): : 5 - 26
  • [2] Analysis on Chaotic Characteristics of Software Project Risk System
    Qu, Ying
    Wang, He
    INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS, 2015, 9 (02): : 49 - 59
  • [3] Risk Analysis of EPC Project Based on ISM
    Cui Caiyun
    Huang Wanxin
    Ma Nan
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1379 - 1383
  • [4] PROJECT RISK ANALYSIS BASED ON PROTOTYPE ACTIVITIES
    KLEIN, JH
    POWELL, PL
    CHAPMAN, CB
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (07) : 749 - 757
  • [5] The Analysis of Project Risk Management Based on AHP
    Liu Hongyan
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 576 - 579
  • [6] Project Risk Pattern Based on Pattern Analysis
    Zhang Ya-li
    Guo Lin
    2009 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING AND INTELLIGENT SYSTEMS, PROCEEDINGS, VOL 3, 2009, : 34 - 37
  • [7] Project risk analysis
    Caron, Franco
    SpringerBriefs in Applied Sciences and Technology, 2013, 0 (9788847052437): : 57 - 65
  • [8] Project Risk Management Analysis Model Based on AHP: A Case of Hangqian Freeway Project
    Zhang, Gen-he
    Tang, Wen-jun
    Liao, Ming-jun
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 663 - 666
  • [9] Dealing with project complexity by matrix-based propagation modelling for project risk analysis
    Fang, Chao
    Marle, Franck
    JOURNAL OF ENGINEERING DESIGN, 2013, 24 (04) : 239 - 256
  • [10] Risk-based project value analysis: A new theoretical framework for project management
    Sato, Tomoichi
    Journal of Japan Industrial Management Association, 2009, 59 (06) : 437 - 442