Preliminary engineering application of microseismic monitoring technique to rockburst prediction in tunneling of Jinping II project

被引:185
|
作者
Tang, Chun'an [1 ]
Wang, Jimin [2 ]
Zhang, Jingjian [3 ]
机构
[1] Dalian Univ Technol, Sch Civil Engn, Dalian 116024, Peoples R China
[2] Ertan Hydropower Dev Co Ltd, Jinping Construct Management Author, Xichang 615012, Peoples R China
[3] North China Inst Water Conservancy & Hydroelect P, Zhengzhou 450011, Henan, Peoples R China
关键词
microseismic monitoring; numerical modeling; rockburst; prediction;
D O I
10.3724/SP.J.1235.2010.00193
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Monitoring and prediction of rockburst remain to be worldwide challenges in geotechnical engineering. In hydropower, transportation and other engineering fields in China, more deep, long and large tunnels have been under construction in recent years and underground caverns are more evidently featured by "long, large, deep and in group", which bring in many problems associated with rock mechanics problems at great depth, especially rockburst. Rockbursts lead to damages to not only underground structures and equipments but also personnel safety. It has been a major technical bottleneck in future deep underground engineering in China. In this paper, compared with earthquake prediction, the feasibility in principle of monitoring and prediction of rockbursts is discussed, considering the source zones, development cycle and scale. The authors think the feasibility of rockburst prediction can be understood in three aspects: (1) the heterogeneity of rock is the main reason for the existence of rockburst precursors; (2) deformation localization is the intrinsic cause of rockburst; and (3) the interaction between target rock mass and its surrounding rock mass is the external cause of rockburst. As an engineering practice, the application of microseismic monitoring techniques during tunnel construction of Jinping II Hydropower Station was reported. It is found that precursory microcracking exists prior to most rockbursts, which could be captured by the microseismic monitoring system. The stress concentration is evident near structural discontinuities (such as faults or joints), which shall be the focus of rockburst monitoring. It is concluded that, by integrating the microseismic monitoring and the rock failure process simulation, the feasibility of rockburst prediction is expected to be enhanced.
引用
收藏
页码:193 / 208
页数:16
相关论文
共 50 条
  • [2] Prediction of rockburst in tunnels at the Jinping II hydropower station using microseismic monitoring technique
    Liu, Fei
    Ma, Tianhui
    Tang, Chun'an
    Chen, Feng
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 81 : 480 - 493
  • [3] APPLICATION OF MICROSEISMIC MONITORING TO STRESS AND ROCKBURST PREDICTION
    CALDER, PN
    ARCHIBALD, JF
    KORENBERG, M
    MOROZ, B
    SEMADENI, T
    YEO, TK
    MCILROY, P
    [J]. CIM BULLETIN, 1986, 79 (887): : 73 - 73
  • [4] Research on Characteristic of Rockburst & Rules of Microseismic Monitoring at Headrace Tunnels in Jinping II Hydropower Station
    Zhang Wen-dong
    Ma Tian-hui
    [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1039 - 1042
  • [5] Rockburst characteristics and microseismic monitoring of deep-buried tunnels for Jinping II Hydropower Station
    Ma, T. H.
    Tang, C. A.
    Tang, L. X.
    Zhang, W. D.
    Wang, L.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 345 - 368
  • [6] Prediction of rockburst based on microseismic monitoring technology
    Wu, A. X.
    Liu, X. H.
    Wang, C. L.
    [J]. ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 45 - 50
  • [7] Rockburst mechanism and prediction based on microseismic monitoring
    Ma, Tian-Hui
    Tang, Chun-An
    Tang, Shi-Bin
    Kuang, Liang
    Yu, Qun
    Kong, De-Qing
    Zhu, Xu
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2018, 110 : 177 - 188
  • [8] Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
    Zhuang, Duanyang
    Ma, Ke
    Tang, Chunan
    Liang, Zhengzhao
    Wang, Zhenwei
    [J]. ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [9] Decision Tree Model for Rockburst Prediction Based on Microseismic Monitoring
    Zhao, Hongbo
    Chen, Bingrui
    Zhu, Changxing
    [J]. ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [10] Rockburst Inducement Mechanism and Its Prediction Based on Microseismic Monitoring
    Li, Yongsong
    Zhou, Chao
    [J]. GEOFLUIDS, 2021, 2021