共 50 条
- [2] TIME CYCLES IN BASIC OXYGEN FURNACE SHOPS [J]. BLAST FURNACE AND STEEL PLANT, 1966, 54 (01): : 31 - &
- [4] START-UP PROBLEMS IN NEW REFRACTORY CONCRETE INSTALLATIONS [J]. AMERICAN CERAMIC SOCIETY BULLETIN, 1971, 50 (04): : 464 - &
- [6] Furnace start-up defects: AZS exudation or corrosion? [J]. Chemical Papers, 2018, 72 : 2137 - 2141
- [7] Successful reline and start-up of E blast furnace [J]. Hyde, J.Barry, 2001, AISE, Pittsburgh, PA, United States (78):
- [8] Furnace start-up defects: AZS exudation or corrosion? [J]. CHEMICAL PAPERS, 2018, 72 (09) : 2137 - 2141
- [9] PARTNERSHIP START-UP EXPENDITURES - RECENT DEVELOPMENTS [J]. JOURNAL OF REAL ESTATE TAXATION, 1981, 8 (03): : 242 - 245
- [10] MATHEMATICAL AND STATISTICAL DESCRIPTION OF THE START-UP RELIABILITY AND START-UP COSTS FOR CONVENTIONAL POWER-STATION EQUIPMENT [J]. ENERGIETECHNIK, 1981, 31 (11): : 408 - 412