共 50 条
- [1] SYNCHRONOUS TRANSFER OF BEAM FROM BOOSTER TO MAIN RING IN KEK PROTON SYNCHROTRON BULLETIN OF THE AMERICAN PHYSICAL SOCIETY, 1977, 22 (02): : 150 - 151
- [3] SYNCHRONOUS TRANSFER OF BEAM FROM NAL FAST CYCLING BOOSTER SYNCHROTRON TO MAIN SYNCHROTRON BULLETIN OF THE AMERICAN PHYSICAL SOCIETY, 1973, 18 (02): : 196 - 196
- [5] KEK BOOSTER-TO-MAIN BEAM TRANSFER SYSTEM BULLETIN OF THE AMERICAN PHYSICAL SOCIETY, 1977, 22 (02): : 160 - 160
- [6] Orbit control and ABS trial at KEK 12GeV proton synchrotron main ring WORKSHOP ON AUTOMATED BEAM STEERING AND SHAPING (ABS), PROCEEDINGS, 1999, 99 (07): : 121 - 125
- [8] Beam position measuriement using linac microstructure at the KEK booster synchrotron PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2509 - 2511
- [9] Proton beam deflection using silicon crystal at the KEK proton synchrotron INTERNATIONAL CONFERENCE ON CHARGED AND NEUTRAL PARTICLES CHANNELING PHENOMENA II - CHANNELING 2006, 2007, 6634
- [10] Proton beam deflection using silicon crystal at the KEK proton synchrotron Proc SPIE Int Soc Opt Eng, 1600,