SAFETY IN GRINDING - UK TEST FACILITY NEEDED

被引:0
|
作者
不详
机构
来源
MACHINERY AND PRODUCTION ENGINEERING | 1975年 / 127卷 / 3290期
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:601 / 601
页数:1
相关论文
共 50 条
  • [1] UK test facility
    不详
    GAS ENGINEERING & MANAGEMENT, 1999, 39 (08): : 31 - 31
  • [2] The Nottingham railway test facility, UK
    Brown, S. F.
    Brodrick, B. V.
    Thom, N. H.
    McDowell, G. R.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2007, 160 (02) : 59 - 65
  • [3] BOOTSTRAP CONCEPT OF A SAFETY TEST FACILITY
    KELBER, CN
    NUCLEAR APPLICATIONS AND TECHNOLOGY, 1970, 9 (06): : 780 - &
  • [4] Test facility aids UK'S push for compliance
    Browne, J
    MICROWAVES & RF, 1997, 36 (01) : 39 - 40
  • [5] Commissioning of the cryogenic safety test facility PICARD
    Heidt, C.
    Schoen, H.
    Stamm, M.
    Grohmann, S.
    ADVANCES IN CRYOGENIC ENGINEERING, 2015, 101
  • [6] Development of a Generic Safety Narrative for a UK Geological Disposal Facility
    Bailey, L.
    MINERALOGICAL MAGAZINE, 2015, 79 (06) : 1633 - 1640
  • [7] REFINER GRINDING FACILITY
    FREEMAN, CW
    PAPIER, 1969, 23 (02): : 82 - &
  • [8] Debut of UK's largest independent EMC test facility
    Neale, R
    ELECTRONIC ENGINEERING DESIGN, 2002, 74 (901): : 33 - 34
  • [9] Safety on site - Operating a test facility for a flight stage
    Haberzettl, A.
    Dommers, M.
    JOURNAL OF SPACE SAFETY ENGINEERING, 2021, 8 (01): : 29 - 34
  • [10] PASSIVE SAFETY TESTING AT THE FAST FLUX TEST FACILITY
    LUCOFF, DM
    NUCLEAR TECHNOLOGY, 1989, 88 (01) : 21 - 29