Personnel participation as a key factor for success in maintenance program implementation A case study

被引:17
|
作者
Garcia Arca, Jesus [1 ]
Carlos Prado Prado, J. [1 ]
机构
[1] Univ Vigo, Vigo, Spain
关键词
Maintenance; Productive maintenance; Total quality management;
D O I
10.1108/17410400810857257
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to put forward the methodology and most important aspects used at the Spanish group of timber companies Grupo Losan to design and implement a satisfactory preventive maintenance program in the manufacture of melamine and veneers in accordance with continuous improvement and TPM philosophy. Design/methodology/approach - The paper draws on empirical evidence from one case study and develops a framework for improvement in continuous improvement management for company competitiveness. Findings - The authors judge the difficulty in implementing a continuous improvement culture to be caused by the complexity of obtaining commitment and involvement from the personnel most affected by the project. In this context, a participative approach and a suitable methodology for implementation are key factors that are not always taken into account by companies. This experience also proposes the important role that researchers can play as "agents of change" from a viewpoint of "action research". Practical implications - The management experience provides companies with a useful guideline to implement continuous improvement culture not only in the maintenance area, but also in supply chain management. Originality/value - The case study covers a gap in the research field on the lack of implementing guidelines which aid adopting continuous improvement in companies.
引用
收藏
页码:247 / 258
页数:12
相关论文
共 50 条
  • [1] Education and Training is a Key Success Factor of Knowledge Management Implementation: A Case Study
    Wai, Yip Mum
    Hong, Alex Ng Hou
    Din, Sabariyah
    Abu Bakar, Nooh
    [J]. PROCEEDINGS OF KNOWLEDGE MANAGEMENT INTERNATIONAL CONFERENCE (KMICE) 2012, 2012, : 417 - +
  • [2] Participation in bilingual education programs as a key factor to linguistic success: the Spanish case
    Javier Palacios-Hidalgo, Francisco
    Elena Gomez-Parra, Maria
    Huertas-Abril, Cristina A.
    Espejo-Mohedano, Roberto
    [J]. LANGUAGE AND EDUCATION, 2022, 36 (06) : 560 - 575
  • [3] Maintainability as a key factor in maintenance productivity: A case study
    Garcia, MJB
    Alvarez, JCG
    [J]. INTERNATIONAL CONFERENCE ON SOFTWARE MAINTENANCE, PROCEEDINGS, 1996, : 87 - 93
  • [4] Key success factor analysis for e-SCM project implementation and a case study in semiconductor manufacturers
    Hwang, Bang-Ning
    Lu, Ta-Ping
    [J]. INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2013, 43 (08) : 657 - 683
  • [5] Success Factor for IT Project Implementation in Banking Industry: A Case Study
    Priambodo, Apiladosi
    Handayani, Putu Wuri
    Pinem, Ave Adriana
    [J]. 2019 3RD INTERNATIONAL CONFERENCE ON INFORMATICS AND COMPUTATIONAL SCIENCES (ICICOS 2019), 2019,
  • [6] Success factor maintenance organization - Case example
    Luttgen, W
    [J]. WOCHENBLATT FUR PAPIERFABRIKATION, 1997, 125 (06): : 237 - 241
  • [7] Implementation of an HPV-vaccination program - Key factors for success
    Kulasingam, Shalini L.
    [J]. DISEASE MANAGEMENT & HEALTH OUTCOMES, 2007, 15 (03) : 141 - 149
  • [8] Key success factors for implementation of Personalized Program after Cancer Treatment
    Irrmann, S.
    Forest, A. -M.
    Dib, B.
    Kacher, A.
    Oger, N.
    Dabot, C.
    Da Costa, V.
    Meunier, S.
    Jeudy, I.
    Colloc, J. -P.
    Lorenzi, I.
    Chalabi, N.
    Nabholtz, J. -M.
    [J]. ONCOLOGIE, 2011, 13 (06) : 295 - 302
  • [9] Preventive Maintenance: The Key Factor for Long-term Treatment Success
    Sculean, Anton
    [J]. ORAL HEALTH & PREVENTIVE DENTISTRY, 2015, 13 (04) : 287 - 287
  • [10] KEY SUCCESS FACTORS IN ROAD MAINTENANCE MANAGEMENT PROJECTS (A CASE STUDY OF MAYSAN PROVINCE, IRAQ)
    Ghanbariand, Milad
    Hasani, Zaid Khalid
    [J]. IIUM ENGINEERING JOURNAL, 2024, 25 (01): : 102 - 114