共 50 条
- [2] Production lot sizing with quality screening, rework and shortages backordered [J]. PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2022, 28 (04): : 604 - 612
- [4] The impact of system deterioration and product warranty on optimal lot sizing with maintenance and shortages backordered [J]. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A. Matemáticas, 2021, 115