A case study of a quality system implementation in a small manufacturing firm

被引:15
|
作者
Bhuiyan, Nadia [1 ]
Alam, Nadeem [1 ]
机构
[1] Concordia Univ, Dept Mech & Ind Engn, Montreal, PQ, Canada
关键词
Quality management; International standards; Quality standards;
D O I
10.1108/17410400510584893
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - This paper aims to present the findings of a case study conducted at ABC Structures (pseudonym), which is a small North American manufacturing company that has spent close to one year working on implementing the ISO 9000 standard. The main obstacles faced by ABC during implementation are highlighted. Although the company was not actually seeking registration, it was motivated by an internal need to improve operations, and by a vision of expanding business globally, in which case it expected that registration would be mandatory. Design/methodology/approach - The case study method was used to achieve the objectives. Information obtained from the case study was collected from various data sources including interviews and informal conversations with the president, sales manager, engineering manager, operations manager, purchasing manager, manufacturing manager and technical personnel, attendance at project meetings, company documents, plant tours, and observations of the manufacturing process and product samples. These sources provided information that was useful in developing and implementing a quality system. Findings - The case study conducted at ABC revealed a number of issues related to the implementation of a quality management system in a small company. While studies have shown that the ISO standard may not be applicable to small businesses, this study shows that the implementation of the standard's requirements benefited the company significantly. However, it should be noted that, while the company did not invest in all of the costs associated with ISO registration, it did invest in implementing as much as it could. Practical implications - This study will be useful to quality managers, quality assurance and/or quality control practitioners, as well as researchers seeking to further understand quality practices and issues surrounding them. The study will also be beneficial to organizations that are planning to implement ISO 9000, are in the implementation phase, or already practising or registered with ISO 9000. While some of the findings presented in this paper are not new, they confirm the results of prior research on the organizational barriers that companies face in the process of implementing a quality management system. Originality/value - The paper provides a description of steps taken by a small manufacturing company prior to implementing ISO 9000. It shows the hurdles it faced, and proposes how they could be overcome.
引用
收藏
页码:172 / +
页数:17
相关论文
共 50 条
  • [1] ABC Implementation in Chinese Manufacturing Firm: A Case Study in a Small and Medium Sized Firm
    Liu, Yu
    Zhang, Y. F.
    Li, W. J.
    Zhu, Y. Y.
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015), 2015, 34 : 46 - 50
  • [2] Barriers in Total Productive Maintenance Implementation in a Semiconductor Manufacturing Firm: A Case Study
    Ng, K. C.
    Goh, G. G. G.
    Eze, U. C.
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 377 - 381
  • [3] Portfolio management and new product development implementation A case study in a manufacturing firm
    Cauchick Miguel, Paulo
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2008, 25 (01) : 10 - +
  • [4] Lean Manufacturing Case Study with Kanban System Implementation
    Rahman, Nor Azian Abdul
    Sharif, Sariwati Mohd
    Esa, Mashitah Mohamed
    [J]. INTERNATIONAL CONFERENCE ON ECONOMICS AND BUSINESS RESEARCH 2013 (ICEBR 2013), 2013, 7 : 174 - 180
  • [5] Enablers of total quality management implementation in manufacturing: a case study
    Gunasekaran, A
    [J]. TOTAL QUALITY MANAGEMENT, 1999, 10 (07): : 987 - 996
  • [6] Model for an integrated manufacturing system implementation in China: a case study
    Tseng, H.C.
    Ip, W.H.
    Ng, K.C.
    [J]. Journal of Engineering and Technology Management - JET-M, 1999, 16 (01): : 83 - 101
  • [7] A model for an integrated manufacturing system implementation in China: a case study
    Tseng, HC
    Ip, WH
    Ng, KC
    [J]. JOURNAL OF ENGINEERING AND TECHNOLOGY MANAGEMENT, 1999, 16 (01) : 83 - 101
  • [8] Information technology and relationship management: a case study of Taiwan's small manufacturing firm
    Liao, SH
    Chem, YW
    Liu, FH
    Liao, WB
    [J]. TECHNOVATION, 2004, 24 (02) : 97 - 108
  • [9] Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm
    Singh, Bhim
    Sharma, S. K.
    [J]. MEASURING BUSINESS EXCELLENCE, 2009, 13 (03) : 58 - 68
  • [10] TOTAL QUALITY MANAGEMENT AND CHANGES IN MANAGEMENT ACCOUNTING SYSTEMS IN A MANUFACTURING FIRM: A CASE STUDY
    Ishanka, Sachini
    Gooneratne, Tharusha
    [J]. ASIA-PACIFIC MANAGEMENT ACCOUNTING JOURNAL, 2018, 13 (01):