Knowledge Management in Construction Projects: a Way Forward in Dealing with Tacit Knowledge

被引:14
|
作者
An, Min [1 ,2 ]
Ahmad, Hesham S. [1 ]
机构
[1] Univ Birmingham, Birmingham, W Midlands, England
[2] Univ Birmingham, Sch Civil Engn, Project & Transport Risk Management, Birmingham, W Midlands, England
关键词
Construction Organisations; Decision Making; Intellectual Capital; Knowledge Management; Tacit Knowledge;
D O I
10.4018/jitpm.2010040102
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Knowledge is now becoming the most valuable asset of the construction organisations to gain competitive advantages by improving quality while reducing cost and time of work completion in projects. Knowledge Management (KM) is the most effective way to deal with the intellectual capital of the organisations through facilitating the capturing and sharing of existing knowledge and creating new innovative knowledge. The most useful knowledge in construction projects is tacit knowledge since it includes the people ideas, perceptions and experiences that can be shared and re-used to improve experiences and enhance abilities of employees for problem-solving and decision-making. Many of methods have been adopted to deal with knowledge in the construction organisations, but they are still far from enough, particularly in dealing with tacit knowledge gained from construction projects. This paper presents a methodology for dealing with tacit knowledge efficiently and effectively in construction projects. A case study has been conducted to evaluate the proposed KM method and to test its importance and usefulness in the construction industry.
引用
收藏
页码:16 / 42
页数:27
相关论文
共 50 条
  • [1] Tacit and explicit knowledge in construction management
    Addis, Mark
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (7-8) : 439 - 445
  • [2] Conceptual framework for capturing tacit knowledge in construction projects
    Kivrak, S.
    Arslan, G.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERIN G AND CONSTRUCTION, 2006, : 271 - +
  • [3] Knowledge management: the way forward
    Gore, C
    Gore, E
    [J]. TOTAL QUALITY MANAGEMENT, 1999, 10 (4-5): : S554 - S560
  • [4] Developing the Framework of Tacit Knowledge Externalization in International Construction Projects
    Zhou, Qianwen
    Deng, Xiaopeng
    Hwang, Bon-Gang
    Zhao, Xianbo
    Zhang, Na
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (09) : 3691 - 3706
  • [5] Developing the Framework of Tacit Knowledge Externalization in International Construction Projects
    Qianwen Zhou
    Xiaopeng Deng
    Bon-Gang Hwang
    Xianbo Zhao
    Na Zhang
    [J]. KSCE Journal of Civil Engineering, 2022, 26 : 3691 - 3706
  • [6] Knowledge Management in Chinese Construction Projects
    Xu, Youquan
    Zhao, Xiuzhu
    Wang, Dedong
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 589 - 592
  • [7] Knowledge management systems and tacit knowledge
    Natek, Srecko
    Lesjak, Dusan
    [J]. INTERNATIONAL JOURNAL OF INNOVATION AND LEARNING, 2021, 29 (02) : 166 - 180
  • [8] Knowledge management, codification and tacit knowledge
    Kimble, Chris
    [J]. INFORMATION RESEARCH-AN INTERNATIONAL ELECTRONIC JOURNAL, 2013, 18 (02):
  • [9] Tacit knowledge management
    Ribeiro, Rodrigo
    [J]. PHENOMENOLOGY AND THE COGNITIVE SCIENCES, 2013, 12 (02) : 337 - 366
  • [10] Tacit knowledge management
    Rodrigo Ribeiro
    [J]. Phenomenology and the Cognitive Sciences, 2013, 12 : 337 - 366