WORK-FORCE SCHEDULING WITH CYCLIC REQUIREMENTS AND CONSTRAINTS ON DAYS OFF, WEEKENDS OFF, AND WORK STRETCH

被引:30
|
作者
EMMONS, H
机构
关键词
D O I
10.1080/07408178508975266
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:8 / 16
页数:9
相关论文
共 37 条
  • [1] WORK-FORCE SCHEDULING WITH CYCLIC REQUIREMENTS AND CONSTRAINTS ON DAYS OFF, WEEKENDS OFF, AND WORK STRETCH.
    Emmons, Hamilton
    1600, (17):
  • [2] Compressed workweek scheduling with days-off consecutivity weekend-off frequency and work stretch constraints
    Alfares, Hesham K.
    INFOR, 2006, 44 (03) : 175 - 189
  • [3] CYCLIC SCHEDULING OF OFF-WEEKENDS
    KOOP, GJ
    OPERATIONS RESEARCH LETTERS, 1986, 4 (06) : 259 - 263
  • [4] SIMPLIFIED SCHEDULING OF ROUTINE WORK HOURS AND DAYS OFF
    BROWNE, JJ
    INDUSTRIAL ENGINEERING, 1979, 11 (12): : 27 - 29
  • [5] SIMPLIFIED SCHEDULING OF ROUTINE WORK HOURS AND DAYS OFF.
    Browne, James J.
    Industrial Engineering (Norcross, Georgia), 1979, 11 (12): : 27 - 29
  • [6] Night work, light exposure and melatonin on work days and days off
    Daugaard, Stine
    Garde, Anne Helene
    Bonde, Jens Peter Ellekilde
    Christoffersen, Jens
    Hansen, Ase Marie
    Markvart, Jakob
    Schlunssen, Vivi
    Skene, Debra J.
    Vistisen, Helene Tilma
    Kolstad, Henrik A.
    CHRONOBIOLOGY INTERNATIONAL, 2017, 34 (07) : 942 - 955
  • [7] DECOMPOSITION PRINCIPLES APPLIED TO THE DYNAMIC PRODUCTION AND WORK-FORCE SCHEDULING PROBLEM
    AARDAL, K
    ARI, A
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4): : 39 - 49
  • [8] Efficient optimization of cyclic labor days-off scheduling
    Alfares, HK
    OR SPEKTRUM, 2001, 23 (02) : 283 - 294
  • [9] WORKFORCE SCHEDULING WITH CYCLIC DEMANDS AND DAY-OFF CONSTRAINTS
    BAKER, KR
    MAGAZINE, MJ
    MANAGEMENT SCIENCE, 1977, 24 (02) : 161 - 167
  • [10] Days off and bright light: Effects on adaptation to night work
    Bougrine, S
    Mollard, R
    Ignazi, G
    Coblentz, A
    INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 1998, 21 (3-4) : 187 - 198