共 37 条
- [4] SIMPLIFIED SCHEDULING OF ROUTINE WORK HOURS AND DAYS OFF INDUSTRIAL ENGINEERING, 1979, 11 (12): : 27 - 29
- [5] SIMPLIFIED SCHEDULING OF ROUTINE WORK HOURS AND DAYS OFF. Industrial Engineering (Norcross, Georgia), 1979, 11 (12): : 27 - 29
- [7] DECOMPOSITION PRINCIPLES APPLIED TO THE DYNAMIC PRODUCTION AND WORK-FORCE SCHEDULING PROBLEM ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4): : 39 - 49