摘要
Purpose - This paper aims to develop a multivariate model that will be applicable to the Nigeria construction industry. Design/methodology/approach - A self-administered questionnaire survey was used to source information on project scope factors and qualitative factors considered in the study. Principal component regression was used for data analysis and model development, using SPSS 16.0 for windows, while T-test was used for model testing and validation. Findings - The study found that delay in progress payment by owner, lateness in revising and approving design document by owner, delay in delivering the site to the contractor by the owner, change order by owner during construction, complexity of project design, poor site management and supervision by contractors, and rain effect on construction activities are qualitative/non-project scope factors with good predictive abilities. Research limitations/implications - Cost, gross floor area and number of floors were the only quantitative/project scope factors considered in the study. The developed models therefore do not account for any variation in duration which may arise from other project scope factors, such as location, procurement route and type of contract. Originality/value - The qualitative factors which emerged as predictors in the derived models increased the accuracy of the models. The models developed therefore serve as useful construction time prediction tools for both consultancy firms and contractor organizations in the Nigerian construction industry.
引用
收藏
页码:65 / +
页数:21
相关论文
共 50 条
  • [1] Modelling building durations in Hong Kong
    [J]. Constr Manage Econ, 2 (189-196):
  • [2] Compressing construction durations: Lessons learned from Hong Kong building projects
    Chan, D.W.M.
    Kumaraswamy, M.M.
    [J]. International Journal of Project Management, 2002, 20 (01) : 23 - 35
  • [3] The Impact of Building Information Modelling: Transforming Construction
    Ashworth, Allan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (02) : 183 - 185
  • [4] CONCEPTUALISING BUILDING INFORMATION MODELLING FOR CONSTRUCTION EDUCATION
    Olowa, Theophilus
    Witt, Emlyn
    Lill, Irene
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (06) : 551 - 563
  • [5] Modelling the Hindrances to Building Information Modelling Adoption on Construction Projects in Nigeria
    Amade, Benedict
    Moneke, Uchenna Ugochi
    Okorie, Christopher Ejimnkonye
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2024, 29 (01) : 23 - 46
  • [6] Reconceptualizing object construction: the dynamics of Building Information Modelling in construction design
    Miettinen, Reijo
    Paavola, Sami
    [J]. INFORMATION SYSTEMS JOURNAL, 2018, 28 (03) : 516 - 531
  • [7] Building Information Modelling, Artificial Intelligence and Construction Tech
    Sacks, Rafael
    Girolami, Mark
    Brilakis, Ioannis
    [J]. DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2020, 4
  • [8] The Barriers of Building Information Modelling (BIM) for Construction Safety
    Taat, Nurul Hasanah Mohd
    Abas, Nor Haslinda
    Hasmori, Muhammad Fikri
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON GREEN ENVIRONMENTAL ENGINEERING AND TECHNOLOGY (ICONGEET 2021), 2022, 214 : 121 - 130
  • [9] BUILDING INFORMATION MODELLING AS A CONSTRUCTION MANAGEMENT TOOL IN NIGERIA
    Onungwa, Ihuoma Onyinyechi
    Uduma-Olugu, Nnezi
    Igwe, Joseph M.
    [J]. BUILDING INFORMATION MODELLING (BIM) IN DESIGN, CONSTRUCTION AND OPERATIONS II, 2017, 169 : 25 - 33
  • [10] Adoption of Building Information Modelling in Malaysia Road Construction
    Yung, A. T. B.
    Aminudin, E.
    Liat, C. N. S.
    Neardey, M.
    Zakaria, R.
    Hamid, A. R. A.
    Ahmad, F.
    Yong, L. Y.
    [J]. 2ND INTERNATIONAL CONFERENCE ON MATERIALS TECHNOLOGY AND ENERGY, 2020, 943