Purpose - Scheduling problems in steel plants tend to be difficult and require complex algorithms due to many constraints. An approach is presented where only the main constraints are included in the scheduling algorithm. The schedule is validated using a discrete-event simulation model that includes additional detail. Design/methodology/approach - The combined approach is utilised for production scheduling in a steel mill in Finland. Operational performance of the steel mill is measured before and after software installation. The paper presents the scheduling environment, the software application and the resulting increase of production. Findings - Case experiences indicate that combining optimisation techniques with simulation is beneficial. The optimisation can be kept simpler as validation with a simulation model increases the credibility and accuracy of the resulting schedule. During software development and testing, the simulation model offered a testing environment for the optimisation algorithm. Practical implications - The case implementation was a success that increased production without making trade-offs with other production goals. Company management estimate the productivity increase directly caused by the project to be worth (sic)2,500,000 annually. Originality/value - The paper presents a successful application of simulation for schedule validation in a complex and demanding environment.
引用
下载
收藏
页码:197 / 210
页数:14
相关论文
共 50 条
  • [1] Contract net protocol for cooperative optimisation and dynamic scheduling of steel production
    Ouelhadj, D
    Cowling, PI
    Petrovic, S
    INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS, 2003, : 469 - 478
  • [2] Production Scheduling Model and its Simulation of Iron and Steel Production Process
    Jiang Guozhang
    Kong Jianyi
    Li Gongfa
    Xie Liangxi
    PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 5319 - 5323
  • [3] Dynamic scheduling and planning of the production in a hybrid flowshop: Simulation and optimisation of a multicriterion objective
    Belkhiter, M
    Gourgand, M
    Traore, MK
    SIMULATION IN INDUSTRY: 9TH EUROPEAN SIMULATION SYMPOSIUM 1997, 1997, : 358 - 362
  • [4] SIMULATION OPTIMISATION FOR OPERATING ROOM SCHEDULING
    Baesler, F.
    Gatica, J.
    Correa, R.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2015, 14 (02) : 215 - 226
  • [5] Model for Hydrogen Production Scheduling Optimisation
    Komasilovs, Vitalijs
    Zacepins, Aleksejs
    Kviesis, Armands
    Bezrukovs, Vladislavs
    MODELLING, 2024, 5 (01): : 265 - 275
  • [6] APPOINTMENT SCHEDULING USING OPTIMISATION VIA SIMULATION
    Koeleman, Paulien
    Koole, Ger
    2012 WINTER SIMULATION CONFERENCE (WSC), 2012,
  • [7] Draw control optimisation in the context of production scheduling
    Smith, ML
    Rahal, D
    PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, 2001, : 831 - 838
  • [8] SIM-SERV case study: Simulation-based production scheduling and capacity optimisation
    Merkuryeva, G
    Shires, N
    ESM'2004: 18TH EUROPEAN SIMULATION MULTICONFERENCE: NETWORKED SIMULATIONS AND SIMULATED NETWORKS, 2004, : 327 - 333
  • [9] Integrating optimisation and simulation to solve manufacturing scheduling problems
    Caggiano, A.
    Bruno, G.
    Teti, R.
    3RD CIRP GLOBAL WEB CONFERENCE - PRODUCTION ENGINEERING RESEARCH ADVANCEMENT BEYOND STATE OF THE ART (CIRPE2014), 2015, 28 : 131 - 136
  • [10] Integrated simulation, heuristic and optimisation approaches to staff scheduling
    Mason, AJ
    Ryan, DM
    Panton, DM
    OPERATIONS RESEARCH, 1998, 46 (02) : 161 - 175