共 50 条
- [1] Dynamics of an oil disperse structure at a late stage of Romashkinskoye deposit development [J]. NEFTYANOE KHOZYAISTVO, 2004, (07): : 55 - 57
- [2] Use of new ways of well production increase at a late stage of development of the Orenburgskoye deposit [J]. NEFTYANOE KHOZYAISTVO, 2004, (11): : 90 - 94
- [3] The monitoring technology and application of pay zone of oil well in the mid-late development stage [J]. Xinan Shiyou Daxue Xuebao/Journal of Southwest Petroleum University, 2007, 29 (06): : 109 - 111
- [4] TECHNOLOGY OF THE CAPITAL REPAIR OF OIL-WELL SUCKER-ROD PUMPS [J]. NEFTYANOE KHOZYAISTVO, 1989, (02): : 36 - 37
- [5] Features of the late stage development of Bashkortostan oil fields [J]. NEFTYANOE KHOZYAISTVO, 2000, (07): : 27 - 30
- [7] INCREASING THE EFFICIENCY OF OIL POOL DEVELOPMENT AT THE LATE STAGE [J]. NEFTYANOE KHOZYAISTVO, 1986, (05): : 29 - 33
- [8] WORK EFFICIENCY IMPROVEMENT DURING WELL DEVELOPMENT AT A LATE STAGE [J]. NEFTYANOE KHOZYAISTVO, 1983, (06): : 33 - 35
- [9] METHODS FOR INCREASING THE EFFICIENCY OF LOW-SEPARATED OIL DEPOSIT DEVELOPMENT AT THE LATE STAGE (BASED ON NGDU-DZHALILNEFT AREA) [J]. NEFTYANOE KHOZYAISTVO, 1985, (11): : 26 - 31
- [10] Petroleum deposits development reactivation at a late stage (on an example of object of Romashkinskoye deposit) [J]. NEFTYANOE KHOZYAISTVO, 2005, (12): : 33 - 37