共 10 条
- [1] PLANT OPERATIONAL EXPERIENCE WITH THE UHP FURNACE OF KRUPP-STAHL-AG IN THE WORKS BOCHUM [J]. STAHL UND EISEN, 1984, 104 (03): : 115 - 121
- [2] THERMAL ECONOMY OF 300 T STEEL CASTING LADLES IN THE LD STEELMAKING PLANT OF KRUPP-STAHL-AG [J]. STAHL UND EISEN, 1987, 107 (01): : 27 - 32
- [3] AUTOMATION IN THE BOCHUM STEEL WORKS OF KRUPP-STAHL-AG - PROCESS-CONTROL AND QUALITY ASSURANCE IN THE PRODUCTION OF STAINLESS-STEELS [J]. STAHL UND EISEN, 1992, 112 (06): : 97 - 102
- [4] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results [J]. Stahl und Eisen, 1997, 117 (05): : 45 - 52
- [5] Power, control and instrumentation system for the new DC electric arc furnace at the Peine steel plant of Preussag Stahl AG [J]. MPT Metallurgical Plant and Technology International, 1996, 19 (05): : 34 - 40
- [6] Power, control and instrumentation system for the new DC electric arc furnace at the Peine steel plant of Preussag Stahl AG [J]. STAHL UND EISEN, 1996, 116 (11): : 77 - &
- [7] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results. [J]. STAHL UND EISEN, 1997, 117 (05): : 45 - +
- [8] Thermal model for operation of arc furnace transformer in steel making plant in a climate of high humidity [J]. IAS 2000 - CONFERENCE RECORD OF THE 2000 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-5, 2000, : 2559 - 2565
- [9] HIGH SEQUENCE CASTING EFFICIENCY WITHOUT TUNDISH AND SUBMERGED TUBE CHANGE OF THE SLAB CONTINUOUS-CASTING PLANTS IN THE LD STEEL PLANT OF KRUPP-STAHL-AG, WORKS-RHEINHAUSEN [J]. STAHL UND EISEN, 1986, 106 (06): : 279 - 281
- [10] Improvement of the design of the steel-making electric-arc furnace (sic)C Pi-40-H1 [J]. OBRABOTKA METALLOV-METAL WORKING AND MATERIAL SCIENCE, 2014, (01): : 76 - 80