共 50 条
- [1] THE COMBINED BILLET AND SLAB CONTINUOUS-CASTING PLANT IN THE WAKAYAMA WORKS OF SUMITOMO-METAL-INDUSTRIES-LTD [J]. STAHL UND EISEN, 1985, 105 (14-1): : 787 - 790
- [2] ENERGY CONTROL-SYSTEM AT WAKAYAMA STEEL WORKS, SUMITOMO-METAL-INDUSTRIES, LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S316 - S316
- [3] REFRESHING OF WAKAYAMA NO-4 SINTER PLANT OF SUMITOMO-METAL-INDUSTRIES-LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : S861 - S861
- [5] GAS LEAKAGE MEASURING SYSTEM IN SINTERING PLANT OF KOKURA-STEEL-WORKS, SUMITOMO-METAL-INDUSTRIES-LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S114 - S114
- [6] REMODELING OF THE PLATING CELLS OF WAKAYAMA ELECTRO-GALVANIZING LINE, SUMITOMO-METAL-INDUSTRIES-LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (05): : S415 - S415
- [7] A COMPUTER CONTROL-SYSTEM FOR THE OPERATION OF WAKAYAMA NO-4 SINTER PLANT OF SUMITOMO-METAL-INDUSTRIES-LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S797 - S797
- [8] IMPROVEMENT OF ROLLING YIELD FOR LARGE SHAPE MILL AT KASHIMA STEEL WORKS, SUMITOMO-METAL-INDUSTRIES-LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1115 - 1115
- [9] CONSTRUCTION AND OPERATION OF DEPHOSPHORIZATION EQUIPMENT OF HOT METAL IN TORPEDO CAR AT WAKAYAMA STEEL WORKS, SUMITOMO METAL INDUSTRIES, LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S998 - S998