共 20 条
- [2] Stochastic Time-Cost-Quality Trade-Off Analysis: The PERT Approach [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 346 - 355
- [3] A Note on Computing the Exact Probability Distribution of the Project Completion Time in a Stochastic PERT Network [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 78 - 82
- [6] Dynamic on-line multimodal route planning with least expected travel time in the stochastic and time-dependent bus network [J]. 2018 6TH INTERNATIONAL CONFERENCE ON TRAFFIC AND LOGISTIC ENGINEERING (ICTLE 2018), 2019, 259
- [7] Reliability evaluation of stochastic-flow network under both time and cost constraints [J]. Sun, Y.-R. (yanruisun@126.com), 1600, Northeast University (34): : 1537 - 1541
- [8] Analysis and estimation of fading time from thermoluminescence glow curve by using artificial neural network [J]. RADIATION EFFECTS AND DEFECTS IN SOLIDS, 2021, 176 (9-10): : 765 - 776