共 50 条
- [1] LASA SENSING SYSTEM DESIGN INSTALLATION AND OPERATION [J]. PROCEEDINGS OF THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, 1965, 53 (12): : 1834 - &
- [2] Design and qualification of an UHV system for operation on sounding rockets [J]. JOURNAL OF VACUUM SCIENCE & TECHNOLOGY A, 2016, 34 (03):
- [3] A review of the design considerations of replacement drive system installation [J]. CONFERENCE RECORD OF THE 2004 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 2004, : 23 - 30
- [4] SYSTEM CONSIDERATION FOR DESIGN INSTALLATION AND OPERATION OF MECHANICAL AERATORS [J]. MECHANICAL ENGINEERING, 1975, 97 (08): : 82 - 83
- [6] DESIGN, INSTALLATION, AND OPERATION OF A MONITORING SYSTEM FOR AN INTERSTATE HIGHWAY BRIDGE [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON STRUCTURE HEALTH MONITORING & INTELLIGENT INFRASTRUCTURE: STRUCTURAL HEALTH MONITORING & INTELLIGENT INFRASTRUCTURE, 2007,
- [7] CONSIDERATIONS IN THE DESIGN AND INSTALLATION OF MONITORING WELLS [J]. GROUND WATER MONITORING AND REMEDIATION, 1983, 3 (01): : 70 - 71
- [8] DESIGN, INSTALLATION AND OPERATION OF A HIGHLY AUTOMATED MODERN PULP PREPARATION SYSTEM [J]. WESTERN ELECTRIC ENGINEER, 1976, 20 (02): : 28 - 41
- [10] DESIGN AND OPERATION OF A COMPLETE MIXING ACTIVATED SLUDGE SYSTEM [J]. SEWAGE AND INDUSTRIAL WASTES, 1958, 30 (03): : 287 - 295