LOT-SIZING RULES AND FREEZING THE MASTER PRODUCTION SCHEDULE IN MATERIAL REQUIREMENTS PLANNING SYSTEMS UNDER DEMAND UNCERTAINTY

被引:39
|
作者
ZHAO, X
GOODALE, JC
LEE, TS
机构
[1] The Department of Applied Statistics and Operational Research, City University of Hong Kong, Kowloon, Tat Chee Avenue
[2] David Eccles School of Business, University of Utah, Salt Lake City, UT
[3] David Eccles School of Business, Chinese University of Hong Kong, Shatin
关键词
D O I
10.1080/00207549508904814
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Freezing the master production schedule (MPS) is one of the frequently used methods for reducing schedule instability in multilevel material requirements planning (MRP) systems. The selection of the lot-sizing rule is an important decision in MRP systems and has been shown to significantly influence MRP performance. This study examines the interaction between the selection of lot-sizing rules and the selection of MPS freezing parameters under rolling time horizons under different demand uncertainty conditions. The findings of this study enhance the understanding of multilevel MRP performance in a more realistic environment and help MRP practitioners select the proper lot-sizing rule and MPS freezing parameters.