Use of simulation for planning of work organization in highly automated production systems - Two case studies

被引:3
|
作者
Zulch, G
Heitz, MJ
Schindele, H
机构
[1] Inst. of Human and Industrial Engineering (ifab - Inst. fur Arbeitswissenschaft und Betriebsorganisa, University of Karlsruhe, D-76128 Karlsruhe
关键词
staff planning; work organization; personnel-oriented simulation; group work;
D O I
10.1016/0925-5273(95)00073-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with the problems of staff planning, especially in highly automated production systems. In planning such systems, it is not sufficient to reflect only on technical details, but it is necessary to consider modern forms of work organization as well. As a planning tool to quantify dynamic processes, simulation will be used. After discussing the need for personnel-oriented simulation tools, two simulation studies will be presented, both focusing on planning the work organization in highly automated production systems in the field of mechanical engineering. The paper concludes with an outlook on future efforts in the regarded held of research.
引用
收藏
页码:429 / 436
页数:8
相关论文
共 50 条