RESOURCE CONSTRAINT MEASURES IN A DUAL CONSTRAINED JOB-SHOP

被引:3
|
作者
GARGEYA, VB
机构
[1] University of North Carolina at Greensboro, NC
来源
关键词
DUAL CONSTRAINTS; JOB SHOP; SCHEDULING; TOOLING; RESOURCE CONSTRAINTS; SIMULATION;
D O I
10.1016/0305-0483(94)90055-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Over the last couple of decades scheduling in the dual constrained job shop has been extensively studied by researchers. Previous scheduling research on dual constrained job shops has assumed that both the resources uniformly constrain the system. However, practice has shown that in job shops, due to the varying product mix, the resource constraining the system changes over time. Also, the interaction of the constraining resources affects shop performance to a much greater degree that the effect caused by either individual constraint. The importance of scheduling based on the resource constraint has been discussed by [2]. Previous literature has not presented any techniques by which to identify the resource constraining the system. In this paper, based on a review of the previous literature, alternative indices are developed to measure the degree to which constraints are operative in the dual constrained job shop. The alternative indices of resource constraint are used in a shop loading algorithm in order to study which of the two measures is a better indicator of resource constraint. A simulation study suggests there may be no major differences in the two indicators of resource constraint with respect to improving shop performance (i.e. root mean squares of tardiness and average job flow time).
引用
收藏
页码:659 / 668
页数:10
相关论文
共 50 条
  • [1] LABOR FLEXIBILITY AND STAFFING LEVELS IN A DUAL-RESOURCE CONSTRAINED JOB-SHOP
    FELAN, JT
    FRY, TD
    PHILIPOOM, PR
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) : 2487 - 2506
  • [2] OPTIMIZATION ALGORITHM SIMULATION FOR DUAL-RESOURCE CONSTRAINED JOB-SHOP SCHEDULING
    Zhong, Q.
    Yang, H.
    Tang, T.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (01) : 147 - 158
  • [3] Ageing workforce effects in Dual-Resource Constrained job-shop scheduling
    Berti, Nicola
    Finco, Serena
    Battaia, Olga
    Delorme, Xavier
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 237
  • [4] JOB-SHOP VS HYBRID FLOWSHOP ROUTING IN A DUAL RESOURCE CONSTRAINED SYSTEM
    ELVERS, DA
    TRELEVEN, MD
    DECISION SCIENCES, 1985, 16 (02) : 213 - 222
  • [5] JOB-SHOP SCHEDULING UNDER A NONRENEWABLE RESOURCE CONSTRAINT
    TOKER, A
    KONDAKCI, S
    ERKIP, N
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (08) : 942 - 947
  • [6] Multi-level heterogeneous worker flexibility in a Dual Resource Constrained (DRC) job-shop
    Felan, JT
    Fry, TD
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) : 3041 - 3059
  • [7] Information and scheduling in a dual resource constrained job shop
    Fredendall, LD
    Melnyk, SA
    Ragatz, G
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (10) : 2783 - 2802
  • [8] Algorithm for dual resource constrained job shop scheduling
    Li J.
    Sun S.
    Huang Y.
    Wang N.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (22): : 175 - 181
  • [9] Information and scheduling in a dual resource constrained job shop
    Clemson Univ, Clemson, United States
    Int J Prod Res, 10 (2783-2802):
  • [10] A case study in a dual resource constrained job shop
    Liao, CJ
    Lin, HT
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (11) : 3095 - 3111