Defining the sustainable building design process: methods for BIM execution planning in the UK

被引:32
|
作者
Zanni, Maria-Angeliki [1 ]
Soetanto, Robby [1 ]
Ruikar, Kirti [1 ]
机构
[1] Loughborough Univ, Sch Civil & Bldg Engn, Loughborough, Leics, England
关键词
Interviews; Building information modelling (BIM); Assessment methods; Integrated DEFinition methods (IDEF0; IDEF3); Interdisciplinary collaboration; Performance modelling; Process mapping; RIBA Plan of Work 2013; Sustainable building design;
D O I
10.1108/IJESM-04-2014-0005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this research is to develop a building information modelling (BIM)-enabled sustainable design process model that identifies critical decisions actions in the design process along with the information and level of detail that facilitate an informed and timely decision. Building performance analysis is usually performed after the design and construction documents are produced, resulting in lost opportunities. Design/methodology/approach - A number of research methods have been adopted; these include extensive literature review and 11 in-depth exploratory interviews with industry practitioners (sustainable building design experts, early BIM adopters). Findings - Project delivery methods have a significant effect on the sustainable outcome of buildings. The development of a structured process can assist sustainable design practice among building professionals. Learning from implemented projects, that have utilised BIM processes, facilitates the scope of creating this process and advises future projects to prevent failures. Process mapping is essential to streamline the process, support key project processes and help the design team manage their own responsibilities and deliverables required by them. Originality/value - The identification of the gap and the need for a structured process for sustainable building design for BIM execution is discussed. The synergies that exist between BIM, building performance modelling, Building Research Establishment's Environmental Assessment Method assessment and the Royal Institute of British Architects Plan of Work are shown. The effect that project delivery has on sustainable design outcome has been established. A coordinated collaborative design process model is presented based on the findings from interviewing early adopters.
引用
收藏
页码:562 / 587
页数:26
相关论文
共 50 条
  • [1] Sustainable Building Design Based on BIM
    Zhu, Sitan
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1746 - 1750
  • [2] Process Framework of Information Modeling for BIM Execution Planning
    Myslin, Josef
    VISION 2020: INNOVATION MANAGEMENT, DEVELOPMENT SUSTAINABILITY, AND COMPETITIVE ECONOMIC GROWTH, 2016, VOLS I - VII, 2016, : 582 - 591
  • [3] Building information modelling (BIM) for sustainable building design
    Wong, Kam-din
    Fan, Qing
    FACILITIES, 2013, 31 (3-4) : 138 - 157
  • [4] BIM-based Sustainable Building Design Process and Decision-making
    Lim, Yaik-Wah
    2017 5TH INTERNATIONAL CONFERENCE ON RESEARCH AND INNOVATION IN INFORMATION SYSTEMS (ICRIIS 2017): SOCIAL TRANSFORMATION THROUGH DATA SCIENCE, 2017,
  • [5] BIM Execution Planning in Green Building Projects: LEED as a Use Case
    Wu, Wei
    Issa, Raja R. A.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (01)
  • [6] Sustainable Building Design based on Building Information Modeling (BIM)
    Kurian, Ciji Pearl
    Milhoutra, Shivani
    George, V. I.
    2016 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2016,
  • [7] Towards a BIM-enabled sustainable building design process: roles, responsibilities, and requirements
    Zanni M.A.
    Soetanto R.
    Ruikar K.
    Zanni, Maria Angeliki (m.a.zanni@lboro.ac.uk), 1600, Taylor and Francis Ltd. (13): : 101 - 129
  • [8] Implementation of BIM Technology into the Design Process Using the Scheme of BIM Execution Plan
    Pruskova, Kristyna
    Kaiser, Jiri
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [9] BIM model methods for suppliers in the building process
    Barbero, A.
    Del Giudice, M.
    Manzone, F.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 291 - 296
  • [10] Sustainable Building through Project Planning Process
    Alias, Anuar
    Isa, Nor Kalsum Mohd
    Samad, Zulkiflee Abdul
    EUROPEAN JOURNAL OF SUSTAINABLE DEVELOPMENT, 2014, 3 (04): : 207 - 218