Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study

被引:0
|
作者
Zahraee, Seyed Mojib [1 ]
Hashemi, Ahmad [1 ]
Abdi, Ahmed Ali [1 ]
Shahpanah, Ataollah [1 ]
Rohani, Jafri Mohd [1 ]
机构
[1] Univ Teknol Malaysia, Fac Mech Engn, Dept Ind Engn, Utm Johor Bahru 81310, Johor, Malaysia
来源
JURNAL TEKNOLOGI | 2014年 / 68卷 / 03期
关键词
Lean manufacturing; value stream mapping; waste; assembly line;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lean Manufacturing (LM) is a business strategy that was developed in Japan. The main contribution of lean manufacturing is the identification and elimination of waste. Companies apply LM to sustain their competitiveness over their competitors by improving the manufacturing system's productivity and quality enhancement of the product. The goal of this paper is to apply one of the most significant lean manufacturing techniques called Value Stream Mapping (VSM) to improve the production line of a company that produces several components for vehicle assembly line by decreasing the waste and non-value added activities. First, the current value stream map of production line was developed using personal interviews, observations and secondary data of the company. Subsequently, the future value stream map was proposed based on the lean manufacturing principles to improve total production lead time and value added time. Based on the final result it can be concluded that VSM is a useful and applicable approach that can help managers conceptualize the different kind of wastes and defects. Final result showed that the production lead time and value added time improved up to nearly 80 % and 12 % respectively by eliminating the wastes based on lean principles and VMS method.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] The Implementation Lean and Green Manufacturing through Sustainable Value Stream Mapping
    Ikatrinasari, Zulfa Fitri
    Hasibuan, Sawarni
    Kosasih, Kosasih
    [J]. INTERNATIONAL CONFERENCE ON DESIGN, ENGINEERING AND COMPUTER SCIENCES, 2018, 453
  • [2] Lean Implementation Through Value Stream Mapping: A Case Study of A Footwear Manufacturer
    Liu, Qingqi
    Yang, Hualong
    [J]. 2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 3390 - 3395
  • [3] Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm
    Singh, Bhim
    Sharma, S. K.
    [J]. MEASURING BUSINESS EXCELLENCE, 2009, 13 (03) : 58 - 68
  • [4] Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study
    Rahani, A. R.
    al-Ashraf, Muhammad
    [J]. INTERNATIONAL SYMPOSIUM ON ROBOTICS AND INTELLIGENT SENSORS 2012 (IRIS 2012), 2012, 41 : 1727 - 1734
  • [5] Lean manufacturing implementation using value stream mapping at excavator manufacturing company
    Masuti, P. M.
    Dabade, U. A.
    [J]. MATERIALS TODAY-PROCEEDINGS, 2019, 19 : 606 - 610
  • [6] Lean manufacturing implementation using value stream mapping as a tool A case study from auto components industry
    Jasti, Naga Vamsi Krishna
    Sharma, Aditya
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2014, 5 (01) : 89 - 116
  • [7] LEAN MANUFACTURING IMPLEMENTATION IN A GEAR SHAFT MANUFACTURING COMPANY USING VALUE STREAM MAPPING
    Nallusamy, S.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2016, 21 : 231 - 237
  • [8] VALUE STREAM MAPPING FOR EFFECTIVE LEAN MANUFACTURING
    Vujica Herzog, Natasa
    Polajnar, Andrej
    Kostanjevec, Tomaz
    [J]. ANNALS OF DAAAM FOR 2008 & PROCEEDINGS OF THE 19TH INTERNATIONAL DAAAM SYMPOSIUM, 2008, : 1515 - 1516
  • [9] Design of lean manufacturing systems using value stream mapping with simulation A case study
    Gurumurthy, Anand
    Kodali, Rambabu
    [J]. JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2011, 22 (04) : 444 - 473
  • [10] Performance Improvement through Value Stream Mapping - A Manufacturing Case Study
    Bugvi, Salman Abubakar
    Hameed, Khurram
    Jamil, M. Fawad
    Irfan, Ali
    Murtaza, Shahid
    Qaiser, Muhammad
    Bilal, Muhammad
    [J]. JURNAL KEJURUTERAAN, 2021, 33 (04): : 1007 - 1018