共 50 条
- [1] ANALYSIS OF 2-STAGE TRANSFER-LINE PRODUCTION SYSTEM SUBJECT TO INTER-STAGE INSPECTION AND ARBITRARY ARRIVAL AND PROCESSING TIME DISTRIBUTIONS [J]. MICROELECTRONICS AND RELIABILITY, 1992, 32 (04): : 479 - 482
- [2] ON THE UTILIZATION ANALYSIS OF A 2-STAGE TRANSFER LINE PRODUCTION SYSTEM SUBJECT TO INTER-STAGE INSPECTION AND INITIAL BUFFER [J]. MICROELECTRONICS AND RELIABILITY, 1991, 31 (01): : 59 - 64
- [3] Probability of first passage analysis of a two-stage transfer-line production system with storage and rework [J]. MICROELECTRONICS AND RELIABILITY, 1996, 36 (03): : 403 - 407
- [4] STOCHASTIC MODELING OF A 2-STAGE TRANSFER-LINE PRODUCTION SYSTEM WITH END BUFFER AND RANDOM DEMAND [J]. MICROELECTRONICS AND RELIABILITY, 1992, 32 (1-2): : 11 - 15
- [5] MULTITYPE REWORK IN 2-STAGE PRODUCTION SYSTEMS - EXPECTED OUTPUT [J]. INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 1994, 25 (12): : 1303 - 1310
- [6] PROBABILISTIC ANALYSIS OF A 2-STAGE PRODUCTION SYSTEM SUBJECT TO INSPECTION AT 1ST STAGE AND INITIAL BUFFER [J]. MICROELECTRONICS AND RELIABILITY, 1993, 33 (06): : 771 - 783
- [9] An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework [J]. OR Spectrum, 2013, 35 : 609 - 638