Knowledge-Based Approach to Assembly Sequence Planning

被引:4
|
作者
Wu, Meiping [1 ]
Prabhu, Vittal [2 ]
Li, Xiaoyu [3 ]
机构
[1] Jiangnan Univ, Sch Mech Engn, Wuxi, Jiangsu, Peoples R China
[2] Penn State Univ, Marcus Dept Ind & Mfg Engn, State Coll, PA USA
[3] Nanjing Univ Aeronaut & Astronaut, Sch Informat Sci & Technol, Nanjing, Jiangsu, Peoples R China
关键词
assembly modeling; assembly sequence planning; DMU (Digital Mock-Up); assembly information model;
D O I
10.1260/1748-3018.5.1.57
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Assembly sequence planning plays a major role in the manufacturing industry. There are still many challenges in the area of assembly planning. One of the significant reasons is the weakness in effective description of assembly knowledge and information. With the purpose of reducing computational complexity, this paper presents a method based on engineering knowledge approach to the assembly sequence planning. The DACG (Directed Assembly Connection Graph) proposed provides an appropriate way to express both geometric information and non-geometric knowledge. In order to increase the assembly planning efficiency, the DACG includes engineering knowledge and semantic in design, manufacturing and assembly fields. Product semantic information model could offer much useful information for designer to finish the assembly (process) design and make right decision in that process. A product assembly planning example is presented to illustrate the effectiveness of the proposed approach. Preliminary experience with the approach indicates the potential to reduce lead times and thereby can help in completing new product launch projects on time.
引用
收藏
页码:57 / 70
页数:14
相关论文
共 50 条
  • [1] A knowledge-based approach to assembly sequence planning
    Tianyang Dong
    Ruofeng Tong
    Ling Zhang
    Jinxiang Dong
    [J]. The International Journal of Advanced Manufacturing Technology, 2007, 32 : 1232 - 1244
  • [2] A knowledge-based approach to assembly sequence planning
    Tianyang Dong
    Ruofeng Tong
    Ling Zhang
    Jinxiang Dong
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 32 (11-12): : 1232 - 1244
  • [3] Integrated knowledge-based assembly sequence planning
    X. F. Zha
    Samuel Y. E. Lim
    S. C. Fok
    [J]. The International Journal of Advanced Manufacturing Technology, 1998, 14 : 50 - 64
  • [4] Knowledge-based assembly sequence planning system
    Dong, TY
    Tong, RF
    Dong, JX
    Zhang, L
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOL 2, 2004, : 516 - 521
  • [5] Integrated knowledge-based assembly sequence planning
    Zha, XF
    Lim, SYE
    Fok, SC
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1998, 14 (01): : 50 - 64
  • [6] A knowledge-based engineering system for assembly sequence planning
    Hsu, Yung-Yuan
    Tai, Pei-Hao
    Wang, Min-Wen
    Chen, Wen-Chin
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8): : 763 - 782
  • [7] A Knowledge-Based Engineering System for Assembly Sequence Planning
    Hsu, Y. Y.
    Chen, W. C.
    Tai, P. H.
    Tsai, Y. T.
    [J]. PROCEEDINGS OF THE 36TH INTERNATIONAL MATADOR CONFERENCE, 2010, : 123 - 126
  • [8] A knowledge-based engineering system for assembly sequence planning
    Yung-Yuan Hsu
    Pei-Hao Tai
    Min-Wen Wang
    Wen-Chin Chen
    [J]. The International Journal of Advanced Manufacturing Technology, 2011, 55 : 763 - 782
  • [9] Knowledge-Based Approach to Assembly Sequence Planning for Wind-Driven Generator
    Wu, Meiping
    Zhao, Yi
    Wang, Chenxin
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [10] KNOWLEDGE-BASED PROCESS PLANNING FOR ELECTRONIC ASSEMBLY
    IRIZARRYGASKINS, VM
    CHANG, TC
    [J]. JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 1990, 3 (01) : 3 - 16