Modified analytic hierarchy process for project proposal evaluation: An alternative method for practical implementation

被引:3
|
作者
Kim, Tschangho John [1 ,2 ]
机构
[1] Univ Illinois, Urbana, IL USA
[2] George Mason Univ, Fairfax, VA 22030 USA
来源
REGIONAL SCIENCE POLICY AND PRACTICE | 2018年 / 10卷 / 01期
关键词
decision processes; OR in government; project evaluation; AHP;
D O I
10.1111/rsp3.12113
中图分类号
P9 [自然地理学]; K9 [地理];
学科分类号
0705 ; 070501 ;
摘要
The purpose of this paper is to develop an alternative means for implementing analytic hierarchy process (AHP). AHP has been widely used for ranking alternative choices among others. AHP builds a matrix containing ordinal scores derived from comparing attributes inherent in alternative criteria. Weights among alternative choices are derived from the eigenvector representing the priorities associated with a special type of positive matrix built according to AHP which become the basis for ranking the alternatives. In practice, matrix operations and calculating the eigenvector are not only a burden to many, but also are difficult to explain the processes and meanings of the eigenvector and eigenvalue to the decision makers using an ordinary common language. The importance of project proposals, particularly for public projects, stems from the fact that implementations of such projects have tremendous impacts on cities and regionals in socio-economic settings. Since AHP is being used widely in the world for evaluating public project proposals among others, the focus of the paper is to develop an alternative way to evaluate public project proposals based on the modified AHP approach for practitioners. The modified approach described in this paper does not need for a separate calculation of eigenvector since the process guarantees making a consistent matrix for pairwise comparative scores. The workings of the modified approach are reported in detail for evaluating a real-world example in ranking project proposals.
引用
收藏
页码:25 / 35
页数:11
相关论文
共 50 条
  • [1] PROJECT PERFORMANCE EVALUATION BY MODIFIED ANALYTIC HIERARCHY PROCESS MODEL
    Kriksciuniene, Dalia
    Sakalauskas, Virgilijus
    Strigunaite, Sandra
    Masteika, Saulius
    TRANSFORMATIONS IN BUSINESS & ECONOMICS, 2015, 14 (01): : 192 - 211
  • [2] Industry Project Evaluation with the Analytic Hierarchy Process
    Zimmer, Sebastian
    Klumpp, Matthias
    Abidi, Hella
    10TH INTERNATIONAL INDUSTRIAL SIMULATION CONFERENCE 2012 (ISC 2012), 2012, : 10 - 18
  • [3] A method of evaluation for scaling in The Analytic Hierarchy Process
    Zhang, Q
    Nishimura, T
    INFORMATION INTELLIGENCE AND SYSTEMS, VOLS 1-4, 1996, : 1888 - 1893
  • [4] Construction engineering project quality evaluation method based on fuzzy analytic hierarchy process
    Shao, Hui
    Fu, Haijian
    2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 228 - 231
  • [5] Application of Gray Analytic Hierarchy Process in Project Risk Evaluation
    Cui, Dong-hong
    Zhang, Xi-yan
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL IV, PROCEEDINGS, 2009, : 592 - 594
  • [6] Analytic Hierarchy Process Based Assessment Method for Performing Project
    Zhang, Jingjing
    Jiang, Yujian
    Jiang, Wei
    Gong, Chen
    PROCEEDINGS OF 2013 2ND INTERNATIONAL CONFERENCE ON MEASUREMENT, INFORMATION AND CONTROL (ICMIC 2013), VOLS 1 & 2, 2013, : 380 - 383
  • [7] An alternative solution to the analytic hierarchy process
    Lamata, MT
    INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS, 2006, 21 (04) : 425 - 441
  • [8] Landscape Evaluation Method Based on Analytic Hierarchy Process
    Zhang lili
    Su yunqiao
    2014 FIFTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS (ISDEA), 2014, : 589 - 592
  • [9] Course Evaluation Method Based on Analytic Hierarchy Process
    Zhao, Chunna
    Zhao, Yu
    Tan, Xiaohui
    Li, Yingshun
    Luo, Liming
    Xiong, Yeqing
    2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL II, 2010, : 318 - 321
  • [10] Application of Fuzzy Analytic Hierarchy Process Method Based on SWOT Theory in Project Risk Evaluation
    Xu, Wei
    Wang, Guoying
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3455 - 3458