EXPANDING OF BOILER TUBES INTO A TUBE NEST

被引:0
|
作者
CULVER, LE
机构
来源
关键词
D O I
10.1243/JMES_JOUR_1966_008_039_02
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
引用
收藏
页码:300 / &
相关论文
共 50 条
  • [1] Fastening and adhesion of boiler tubes and water pipes in boiler tube walls.
    Berndt, O
    [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1924, 68 : 809 - 810
  • [2] Failure analysis of the wall tubes of a water-tube boiler
    Duarte, Camilo A.
    Espejo, Edgar
    Carlos Martinez, Juan
    [J]. ENGINEERING FAILURE ANALYSIS, 2017, 79 : 704 - 713
  • [3] Welding boiler tubes
    Wilkerson, Roy
    [J]. WELDING JOURNAL, 2006, 85 (11) : 72 - 72
  • [4] PRODUCTION OF BOILER TUBES
    KOBUS, AA
    VASHCHILO, TP
    OPRYSHKO, LV
    GULYAEV, GI
    CHELYSHEV, VV
    [J]. STEEL IN TRANSLATION, 1992, 22 (03) : 141 - 143
  • [5] Study on the coordination control of pressure in the boiler tube of the mother tube boiler
    Song Qing-kun
    Han Xiao
    [J]. 2015 3RD INTERNATIONAL CONFERENCE ON COMPUTER AND COMPUTING SCIENCE (COMCOMS), 2016, : 28 - 31
  • [6] Implementation of continuously cast metal into commercial production of boiler tubes at JSC Volzhsky tube plant
    Opryshko, L.V.
    Vashchilo, T.P.
    Kobus, A.A.
    [J]. Metallurgicheskaya i Gornorudnaya Promyshlennost, 2001, (01): : 56 - 60
  • [7] IMPROVING QUALITY OF TUBE BLANKS AND TUBES MADE OF BOILER STEELS (JOINTLY WITH AK SEROV COMBINE)
    SYREISHC.VM
    VLASOV, NN
    KHUSNOYA.KB
    [J]. STAL IN ENGLISH-USSR, 1966, (10): : 841 - &
  • [8] Sand cleaning of boiler tubes
    不详
    [J]. MATERIALS PERFORMANCE, 2004, 43 (04) : 36 - 37
  • [9] FLASH WELDING OF BOILER TUBES
    KAZYMOV, BI
    KUCHUKYA.SI
    KORSUNOV, VM
    EDEMSKII, EI
    [J]. AUTOMATIC WELDING USSR, 1972, 25 (09): : 52 - 55
  • [10] ULTRASONIC INSPECTION OF BOILER TUBES
    OSTROFSKY, B
    PARRISH, CB
    [J]. MATERIALS EVALUATION, 1968, 26 (06) : 106 - +