共 50 条
- [2] Change in relationship of Jingjiang river and Dongting lake after operation of Three Gorges Project [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2012, 31 (05): : 163 - 172
- [3] Water-sediment relation between Jingjiang River and Dongting Lake and its adjustment [J]. Wuhan Daxue Xuebao (Gongxue Ban)/Engineering Journal of Wuhan University, 2002, 35 (03):
- [4] A mathematical model for flood routing and flood stage prediction of the lower Yellow River [J]. FORECASTING AND MITIGATION OF WATER-RELATED DISASTERS, THEME C, PROCEEDINGS: 21ST CENTURY: THE NEW ERA FOR HYDRAULIC RESEARCH AND ITS APPLICATIONS, 2001, : 8 - 16
- [5] Flood Routing Numerical Simulation in Jingjiang Diversion Area Based on MIKE FLOOD Model [J]. Zhou, Jianzhong (jz.zhou@hust.edu.cn), 1600, Editorial Board of Journal of Basic Science and (25): : 905 - 916
- [8] The hydrological effect between Jingjiang River and Dongting Lake during the initial period of Three Gorges Project operation [J]. Journal of Geographical Sciences, 2010, 20 : 771 - 786
- [9] Flood hydrograph coincidence analysis of the upper Yangtze River and Dongting Lake, China [J]. Natural Hazards, 2022, 110 : 1339 - 1360