PERFORMANCE CRITERIA FOR MECHANIZED MINING EQUIPMENT

被引:0
|
作者
WAGNER, H
OBERHOLZER, J
机构
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:A78 / A84
页数:7
相关论文
共 50 条
  • [1] Calculation of production capacity of mechanized mining face equipment
    Zheng, Xinchou
    Coal Science and Technology (Peking), 1993, 21 (11):
  • [3] Development of intelligent technology and equipment in fully-mechanized coal mining face
    Wang, Jin-Hua
    Huang, Le-Ting
    Li, Shou-Bin
    Huang, Zeng-Hua
    Wang, Jin-Hua, 1600, China Coal Society (39): : 1418 - 1423
  • [4] Mechanized Roof Supports at the 1972 Exhibition of Mining Equipment in London, England.
    Boxho, Jose
    Annales des Mines de Belgique, 1973, (02): : 213 - 241
  • [5] Research on the adaptability large mining height fully-mechanized mining equipment to panel mining of unstable coal seam
    Wen, He-Xing
    Liu, Yu-de
    Meng, Xiang-Tian
    PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 983 - 986
  • [6] Mine water quality variation during the overhaul of fully mechanized mining equipment in Shenfu mining area
    Yang J.
    Wang Q.
    Wang T.
    Zhang X.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (12): : 3710 - 3718
  • [7] MECHANIZED CHEESEMAKING EQUIPMENT
    不详
    AMERICAN DAIRY REVIEW, 1971, 33 (06): : 30 - &
  • [8] Estimation criteria for energy consumption by mining equipment in quarries
    V. I. Cheskidov
    O. B. Kortelev
    A. N. Aleksandrov
    D. Kh. Il’bul’din
    Journal of Mining Science, 2004, 40 : 380 - 383
  • [9] Estimation criteria for energy consumption by mining equipment in quarries
    Cheskidov, VI
    Kortelev, OB
    Aleksandrov, AN
    Il'bul'din, DK
    JOURNAL OF MINING SCIENCE, 2004, 40 (04) : 380 - 383
  • [10] Stability Control of the Equipment Recovery Passage in a Fully Mechanized Longwall Mining: Case Study
    Zhiyi Zhang
    Hui Chen
    Dongfa Li
    Zhiqiang Zhang
    Geotechnical and Geological Engineering, 2021, 39 : 799 - 813