BOREALIS PROJECT - A FAST-TRACK APPROACH TO MINE DEVELOPMENT

被引:0
|
作者
LIGHTNER, FH [1 ]
FAVERTY, RL [1 ]
COUGHLIN, WE [1 ]
机构
[1] GETTY OIL CORP,MERCUR MINE,LOS ANGELES,CA
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:1564 / 1565
页数:2
相关论文
共 50 条
  • [1] Fast-track hysterectomy: a pilot project
    Ulrich, D.
    Tamussino, K.
    Fruhmann, A.
    Mueller, G.
    Amon, B.
    Schoenett, B.
    Bjelic-Radisic, V
    Bader, A.
    Winter, R.
    [J]. GEBURTSHILFE UND FRAUENHEILKUNDE, 2009, 69 (05) : 478 - 478
  • [2] Fast-track your pilot plant project
    Martin, P
    Dietrich, MJ
    [J]. CHEMICAL ENGINEERING PROGRESS, 2005, 101 (01) : 26 - 31
  • [3] Fast-track project management in the biopharmaceutical industry
    Djurslev, Finn
    [J]. Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 51 - 53
  • [4] A FAST-TRACK APPROACH TO ALGEBRA FOR ADULTS
    Hubbard, Ruth
    [J]. PME 30: PROCEEDINGS OF THE 30TH CONFERENCE OF THE INTERNATIONAL GROUP FOR THE PSYCHOLOGY OF MATHEMATICS EDUCATION, VOL 1,, 2006, : 399 - 399
  • [5] GIBRALTAR MINE EXPANSION-DESIGN CONSIDERATION FOR A "FAST-TRACK" BROWN-FIELD PROJECT
    Rotzinger, Rob
    Bellisomo, Max
    [J]. RECENT ADVANCES IN MINERAL PROCESSING PLANT DESIGN, 2009, : 130 - 138
  • [6] THE FAST-TRACK
    KAPLAN, JA
    [J]. JOURNAL OF CARDIOTHORACIC AND VASCULAR ANESTHESIA, 1995, 9 (05) : 1 - 1
  • [7] FAST-TRACK
    MCMILLION, R
    [J]. ABA JOURNAL, 1993, 79 : 97 - 97
  • [8] FAST-TRACK PROJECT SCHEDULE SPEEDS CORRECTIONAL FACILITIES
    SMITH, WD
    MCCARTHY, J
    [J]. AMERICAN CITY & COUNTY, 1984, 99 (03) : 56 - &
  • [9] Vacuum column revamp - a fast-track turnkey project
    Hood, AR
    Stander, A
    Lilburne, G
    Soydaner, S
    [J]. HYDROCARBON PROCESSING, 1999, 78 (11): : 63 - +
  • [10] China - BP plans fast-track PP project
    Young, I
    [J]. CHEMICAL WEEK, 1999, 161 (35) : 27 - 27