PLANNING AND WELL EVALUATIONS IMPROVE HORIZONTAL DRILLING RESULTS

被引:0
|
作者
HOVDA, S
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:38 / 43
页数:6
相关论文
共 50 条
  • [1] Drilling and geosciences cooperate to improve well-planning quality
    Bybee, K
    JOURNAL OF PETROLEUM TECHNOLOGY, 2002, 54 (02): : 44 - 44
  • [2] Horizontal well drilling and operation
    Rizvanov, NM
    Gainullin, KK
    Yumashev, RK
    Kagarmanov, NF
    Timashev, EM
    Samigullin, VK
    NEFTYANOE KHOZYAISTVO, 1996, (02): : 12 - 16
  • [3] HORIZONTAL WELL PLANNING
    SCHUH, FJ
    AAPG BULLETIN-AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS, 1991, 75 (03): : 668 - 668
  • [5] Optimization of well length for horizontal drilling
    Cho, H
    Shah, SN
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2002, 41 (05): : 54 - 62
  • [6] The posting-buckling analysis and evaluations of limit drilling length for coiled tubing in the sidetrack horizontal well
    Yue Qianbei
    Liu, Jubao
    Zhang, Ligang
    Zhang, Qiang
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2018, 164 : 559 - 570
  • [7] Well planning, evaluation programs improve Phillips' gulf results
    Jones, ML
    Alworth, CD
    OIL & GAS JOURNAL, 1999, 97 (38) : 56 - +
  • [8] Well planning, evaluation programs improve Phillips' gulf results
    Jones, Morgan L.
    Alworth, C.Dwight
    Oil and Gas Journal, 1999, 97 (38):
  • [9] Horizontal drilling: Making your well a success
    Martin, Ronald B.
    Leading Edge, 1992, 11 (08): : 21 - 26
  • [10] DRILLING AND COMPLETING A HORIZONTAL WELL IN FRACTURED CARBONATE
    HAAS, RC
    STOKLEY, CO
    WORLD OIL, 1989, 209 (04) : 39 - &