STATUS OF THE BOOSTER SYNCHROTRON FOR SPRING-8

被引:3
|
作者
SUZUKI, H
YONEHARA, H
AOKI, T
TANI, N
KANEDA, T
UEYAMA, Y
SASAKI, Y
NAGAFUCHI, T
HAYASHI, S
YOKOMIZO, H
机构
[1] Jaeri-Riken SPring-8 Project Team, Naka-gun, Ibaraki-ken
来源
REVIEW OF SCIENTIFIC INSTRUMENTS | 1995年 / 66卷 / 02期
关键词
D O I
10.1063/1.1145771
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The specification and the layout of the booster synchrotron for SPring-8 were decided. The synchrotron is designed to accelerate electron or positron beams from 1 to 8 GeV with a repetition cycle of 1 Hz. The construction of the synchrotron was started in 1993. First, one bending, one quadrupole, and one sextupole magnet were made and the results of the magnetic field measurement were acquired. Two septum, one bump, and one kicker magnets for the beam extraction have been made, the field measurement and a few improvements have progressed. The high power test of the first rf cavity was finished successfully. The calibration test of the button position monitor with the signal treatment circuits is advanced now. The residual components of the synchrotron are designed and constructed, and the commissioning of the synchrotron will start in 1996. This paper presents the first measurement of each component. © 1995 American Institute of Physics.
引用
收藏
页码:1964 / 1967
页数:4
相关论文
共 50 条
  • [1] Development of the pulse magnets for the booster synchrotron of SPring-8
    Yonehara, H
    Suzuki, H
    Nagafuchi, T
    Kodaira, M
    Aoki, T
    Tani, N
    Hayashi, S
    Ueyama, Y
    Kaneda, T
    Sasaki, Y
    Abe, H
    Yokomizo, H
    [J]. PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 1996, : 1358 - 1360
  • [2] Bunched beam cleaning system of spring-8 booster synchrotron
    Aoki, T
    Fukami, K
    Hosoda, N
    Ohshima, T
    Shoji, M
    Tamura, K
    Yonehara, H
    [J]. PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2551 - 2553
  • [3] Formation of a single-bunch beam in the booster synchrotron at SPring-8
    Suzuki, H
    Aoki, T
    Ego, H
    Hara, M
    Hosoda, N
    Kawashima, Y
    Ohashi, Y
    Ohshima, T
    Tani, N
    Yabashi, M
    Yonehara, H
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2000, 444 (03): : 515 - 533
  • [4] Beam commissioning of the SPring-8 synchrotron
    Suzuki, H
    Aoki, T
    Tani, N
    Fukami, K
    Hosoda, N
    Kobayashi, T
    Hayashi, S
    Ohzuchi, S
    Tanimoto, M
    Okanishi, K
    Sasaki, T
    Yonehara, H
    [J]. JOURNAL OF SYNCHROTRON RADIATION, 1998, 5 : 357 - 359
  • [5] PRESENT STATUS OF THE SPRING-8 PROJECT
    OHNO, H
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 1995, 97 (1-4): : 509 - 514
  • [6] The start of a new generation: the present status of the SPring-8 synchrotron and its use in structural biology
    Ueki, T
    Yamamoto, M
    [J]. STRUCTURE WITH FOLDING & DESIGN, 1999, 7 (08): : R183 - R187
  • [7] Present Status and Research Frontiers on the SPring-8
    Ohno, Hideo
    [J]. Zairyo to Kankyo/ Corrosion Engineering, 2004, 53 (01): : 3 - 6
  • [8] Present status of SPring-8 insertion devices
    Kitamura, H
    [J]. JOURNAL OF SYNCHROTRON RADIATION, 1998, 5 : 184 - 188
  • [9] Present status of the SPring-8 storage ring
    Hara, M
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2000, 448 (1-2): : 12 - 19
  • [10] SPring-8 structural biology beamlines/current status of public beamlines for protein crystallography at SPring-8
    Kawamoto, Masahide
    Hasegawa, Kazuya
    Shimizu, Nobutaka
    Sakai, Hisanobu
    Shimizu, Tetsuya
    Nisawa, Atsushi
    Yamamoto, Masaki
    [J]. SYNCHROTRON RADIATION INSTRUMENTATION, PTS 1 AND 2, 2007, 879 : 1920 - +