NEW SEMI-SUBMERSIBLE WILL BE DYNAMICALLY POSITIONED

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:58 / 58
页数:1
相关论文
共 50 条
  • [1] Upgrading of a semi-submersible platform to a dynamically positioned drilling unit to operate in 2500-m water depth
    PETROBRAS R&D Cent, Rio de Janeiro, Brazil
    Proc Int Offshore Polar Eng Conf, (210-217):
  • [2] Upgrading of a semi-submersible platform to a dynamically positioned drilling unit to operate in 2500-m water depth
    Bardanachvili, CA
    dos Santos, AB
    Voronoff, A
    Paschoalin, R
    Campos, LD
    Pitta, AS
    PROCEEDINGS OF THE NINTH (1999) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 1999, 1999, : 210 - 217
  • [3] A new platform for autonomous semi-submersible surveying
    Young, HW
    Phillips, SJ
    SEA TECHNOLOGY, 2005, 46 (06) : 31 - +
  • [4] First of new-design semi-submersible delivered
    不详
    NAVAL ARCHITECT, 2003, : 28 - 28
  • [5] NEW SEMI-SUBMERSIBLE RIG DESIGNED FOR GULF OF ALASKA
    CAMACHOA, G
    REMSON, DR
    WORLD OIL, 1977, 184 (05) : 63 - 67
  • [6] SEMI-SUBMERSIBLE TO BE CONSTRUCTED WITH CONCRETE
    不详
    WORLD OIL, 1975, 180 (01) : 115 - &
  • [7] Development of a New Unmanned Semi-Submersible (USS) Vehicle
    Alleman, Pete
    Kleiner, Art
    Steed, Chad
    Hook, Dan
    OCEANS 2009, VOLS 1-3, 2009, : 2416 - +
  • [8] Prediction of Motion of a Semi-submersible
    Alimuddin, M.
    Islam, M. Rafiqul
    10TH INTERNATIONAL CONFERENCE ON MARINE TECHNOLOGY (MARTEC 2016), 2017, 194 : 144 - 151
  • [9] MOTION COMPARISON BETWEEN A CONVENTIONAL DEEP DRAFT SEMI-SUBMERSIBLE AND A DRY TREE SEMI-SUBMERSIBLE
    Hussain, Anis
    Nah, Edwin
    Fu, Rain
    Gupta, Apurva
    OMAE 2009, VOL 1: OFFSHORE TECHNOLOGY, 2009, : 785 - 792
  • [10] FATIGUE CONSIDERATIONS FOR SEMI-SUBMERSIBLE STRUCTURES
    RIGGS, RP
    MARINE TECHNOLOGY AND SNAME NEWS, 1979, 16 (01): : 49 - 62