共 50 条
- [3] Why CPM is Not Good Enough for Scheduling Projects [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1748 - 1752
- [5] LIBRARY AND INFORMATION-SYSTEMS - PLANNING, SCHEDULING AND CONTROL THROUGH THE PERT CPM [J]. LIBRARY SCIENCE WITH A SLANT TO DOCUMENTATION, 1981, 18 (04): : 248 - 262
- [10] Linearised CPM-COST model in the planning of construction projects [J]. INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 : 129 - 135