Empirical tests for identifying leading indicators of ENR Construction Cost Index

被引:48
|
作者
Ashuri, Baabak [1 ]
Shahandashti, Seyed Mohsen [1 ]
Lu, Jian [1 ]
机构
[1] Georgia Inst Technol, Sch Bldg Construct, ESBE Lab, 280 Ferst Dr,First Floor, Atlanta, GA 30332 USA
关键词
Cointegration; cost estimation; ENR Construction Cost Index; Granger causality; leading indicator;
D O I
10.1080/01446193.2012.728709
中图分类号
F [经济];
学科分类号
02 ;
摘要
Engineering News-Record (ENR) publishes its Construction Cost Index (CCI) monthly. CCI is the weighted average price of construction activities in 20 United States (US) cities. CCI has widely been used for cost estimation, bid preparation and investment planning. Cost estimators and investment planners are not only interested in the current CCI, but also are interested in forecasting changes in CCI trends. However, CCI is subject to significant variations that are difficult to predict. An important step towards forecasting CCI trends is to identify its leading indicators. The research objective is to identify the leading indicators of CCI using empirical tests. The results of Granger causality tests show that consumer price index, crude oil price, producer price index, GDP, employment levels in construction, number of building permits, number of housing starts and money supply are the leading indicators of CCI. The results of Johansen's cointegration tests show that money supply and crude oil price are the leading indicators with long-term relationships with CCI. These findings contribute to the body of knowledge in CCI forecasting. CCI can be predicted more accurately using its leading indicators. Cost estimators and capital project planners can benefit from better forecasting through reduction in uncertainty about future construction costs.
引用
收藏
页码:917 / 927
页数:11
相关论文
共 50 条
  • [1] Time Series Analysis of ENR Construction Cost Index
    Ashuri, Baabak
    Lu, Jian
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (11) : 1227 - 1237
  • [2] Predicting ENR's Construction Cost Index Using the Modified K Nearest Neighbors (KNN) Algorithm
    Wang, Jun
    Ashuri, Baabak
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2502 - 2509
  • [3] Leading indicators of construction safety performance
    Hinze, Jimmie
    Thurman, Samuel
    Wehle, Andrew
    [J]. SAFETY SCIENCE, 2013, 51 (01) : 23 - 28
  • [4] Engineering, Procurement, and Construction Cost and Schedule Performance Leading Indicators: State-of-the-Art Review
    Habibi, Mohammadreza
    Kermanshachi, Sharareh
    Safapour, Elnaz
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 378 - 388
  • [5] Leading indicators of construction price movement in China
    Shang Mei
    [J]. Advances in Management of Technology, Proceedings, 2006, : 214 - 219
  • [6] Safety leading indicators in construction: A systematic review
    Xu, Jing
    Cheung, Clara
    Manu, Patrick
    Ejohwomu, Obuks
    [J]. SAFETY SCIENCE, 2021, 139
  • [7] The index of leading spiritual indicators - Barna,G
    Moryl, J
    [J]. LIBRARY JOURNAL, 1996, 121 (13) : 77 - 78
  • [8] A more timely and useful index of leading indicators
    McGuckin, Robert H.
    Ozyildirim, Ataman
    Zarnowitz, Victor
    [J]. JOURNAL OF BUSINESS & ECONOMIC STATISTICS, 2007, 25 (01) : 110 - 120
  • [9] A composite index of leading indicators of unemployment in Nigeria
    Tule, Moses
    Ajilore, Taiwo
    Ebuh, Godday
    [J]. JOURNAL OF AFRICAN BUSINESS, 2016, 17 (01) : 87 - 105
  • [10] Leading indicators of innovation as a competence for individuals: an empirical study
    Waychal, Pradeep
    Mohanty, R. P.
    Verma, Ajit
    [J]. JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2011, 8 (02) : 301 - 322