共 50 条
- [2] OPERATION OF GRANULATION EQUIPMENT FOR ELECTRIC-ARC FURNACE SLAG [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (06): : T73 - T76
- [3] EFFECTS OF SPONGE IRON ON THE ELECTRIC-ARC FURNACE OPERATION [J]. ISIJ INTERNATIONAL, 1993, 33 (11) : 1174 - 1181
- [4] COMPUTER CONTROL OF ELECTRIC-ARC FURNACES [J]. IRON AND STEEL INTERNATIONAL, 1984, 57 (04): : 131 - 133
- [5] STATIC COMPUTER CONTROL MODEL FOR ELECTRIC-ARC FURNACE ON HEAT AND MASS BALANCE [J]. TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS, 1989, 42 (05): : 431 - 440
- [6] ELECTRIC-ARC FURNACE REFRACTORIES [J]. TRANSACTIONS AND JOURNAL OF THE BRITISH CERAMIC SOCIETY, 1973, 72 (03): : 109 - 112
- [9] COMPUTERIZED CONTROL IN A LARGE ELECTRIC-ARC FURNACE SHOP [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1985, 85 (10): : 347 - 355
- [10] COMPUTER CONTROL OF ELECTRIC-ARC FURNACE STEELMAKING PROCESS BASED ON A MATHEMATICAL-MODEL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1988, 74 (11): : 2122 - 2129