Study of model test of vehicle impact effects on bridge and tunnel connected project in weak surrounding rock

被引:0
|
作者
Sun Guang-chen [1 ,2 ]
Fu He-lin [1 ]
Chao Wan-li [3 ]
机构
[1] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
[2] Zhongye Changtian Int Engn Co Ltd, Changsha 410007, Hunan, Peoples R China
[3] Hunan Commun Res Inst, Changsha 410015, Hunan, Peoples R China
关键词
weak surrounding rocks; bridge and tunnel connected section; indoor model tests; test methods; vehicle impact; mechanical behaviors; action effects;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In order to investigate the mechanical and deformation characteristics or action effects caused by vehicles and impacts on important parts of bridge or tunnel connecting sections under weak surrounding rocks especially grade. or. surrounding rocks, systematical indoor model tests have been carried out. The relationship among physical quantities and the similarity indexes have been worked out under the dimensional analysis method of the similarity theorem considering the characteristics of bridge and tunnel connecting projects. The model test methods such as test contents, working conditions, test equipments and instruments etc., have been systematically analyzed and elaborated. Through analyzing the test phenomena and results, some conclusions are drawn as follows: the vehicle loads with impact actions during post operation stage cause harmful mechanical effects or structure damages on some key parts of bridge or tunnel, such as oversize displacement on bridge mid- span and lap joint tip or oversize settlement of tunnel bottom, or lower stability of surrounding rocks nearby tunnel entrance etc. Consequently, for bridge and tunnel connecting projects under. or. surrounding rocks, some key parts of bridge, tunnel lining and surrounding rocks nearby the entrance should be strengthened in order to avoid damages or diseases
引用
收藏
页码:2929 / 2936
页数:8
相关论文
共 7 条
  • [1] Chen X. H., 2006, VIBRATION SHOCK, V25, P95
  • [2] DONG Chang-zhou, 2010, HIGHWAY, P207
  • [3] Kerr A., 1995, AM RAILWAY ENG ASS, V742, P267
  • [4] [刘佑荣 Liu Yourong], 2004, [岩土力学, Rock and Soil Mechanics], V25, P1828
  • [5] Liu Z.M., 1999, BRIDGE CONSTR BRIDGE, V4, P1
  • [6] Tao W, 2008, ROCK SOIL MECH, V29, P1589
  • [7] WANG Fei, 2008, COMMUNICATIONS STAND, P124