RISK ASSESSMENT IN RESERVE ESTIMATION AND OPEN-PIT PLANNING

被引:0
|
作者
DOWD, PA
机构
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Sensitivity analyses based on financial variables are now routinely applied to the forecast financial results of mining projects, especially during the feasibility stage. Risk analysis is gaining acceptance, but it is still almost universally confined to the effects of variations in financial variables. Although the single most sensitive factor in almost all mining projects is the ore reserve, it is either ignored or improperly used in sensitivity and risk analyses. Unlike financial variables, the components of the ore reserve (grades and tonnages of mining blocks) are a function of location within the orebody, and physical (mining) access to these components is therefore a function of time, which has a critical effect on forecast cash flows. It is essential that these fundamental concepts are included in risk analyses of mining projects. The effects of the uncertainty of the ore reserve on feasibility studies and open-pit mine design for a small gold-mining venture are explored. Geostatistical simulation is employed as a method of quantifying the risk associated with the use of grades and tonnages that have been estimated from sparse data.
引用
收藏
页码:A148 / A154
页数:7
相关论文
共 50 条
  • [1] DISCOUNT RATES AND RISK ASSESSMENT IN MINERAL PROJECT EVALUATIONS - RISK ASSESSMENT IN RESERVE ESTIMATION AND OPEN-PIT PLANNING - INCLUSION OF RISK ASSESSMENT IN OPEN-PIT DESIGN AND SCHEDULING
    TAYLOR, HK
    DAVIS, GA
    SMITH, LD
    DOWD, PA
    [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1995, 104 : A187 - A191
  • [2] OPEN-PIT ORE RESERVE ESTIMATION AND MINE PLANNING
    JOHNSTON, T
    CLAUSSEN, G
    BLACKWELL, G
    [J]. CIM BULLETIN, 1985, 78 (875): : 82 - 82
  • [3] INCLUSION OF RISK ASSESSMENT IN OPEN-PIT DESIGN AND SCHEDULING
    DENBY, B
    SCHOFIELD, D
    [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1995, 104 : A67 - A71
  • [4] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [5] INTEGRATED OPEN-PIT PLANNING APPROACH AND SYSTEMS
    MELLISH, M
    PRELLER, AH
    TUTTON, DA
    [J]. TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1987, 96 : A162 - A170
  • [6] Optimizing open-pit block scheduling with exposed ore reserve
    Saavedra-Rosas, J.
    Jelvez, E.
    Amaya, J.
    Morales, N.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (07) : 655 - 662
  • [7] A theorem on open-pit planning optimization and its application
    Wang, Q
    Sun, HR
    [J]. COMPUTER APPLICATIONS IN THE MINERALS INDUSTRIES, 2001, : 295 - 298
  • [8] APPLICATION OF OPERATIONS RESEARCH METHODS IN OPEN-PIT PLANNING
    CLAPHAM, JC
    LEOONARD, GE
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (653): : 1062 - &
  • [9] COMPUTER-APPLICATIONS IN OPEN-PIT MINE PLANNING
    GARG, O
    PICHE, A
    [J]. CIM BULLETIN, 1979, 72 (805): : 69 - 75
  • [10] APPLICATION OF GEOTECHNICAL STUDIES IN OPEN-PIT MINE PLANNING
    GARG, OP
    [J]. CIM BULLETIN, 1976, 69 (773): : 65 - 65