共 50 条
- [6] Development of a Stochastic Simulation Model for Estimating Construction Time Durations [J]. INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2011, 14 (07): : 2207 - 2218
- [7] Estimating the emissions of nitrogen oxides (NOX) and particulate matter (PM) from diesel construction equipment by using the productivity model [J]. WORLD JOURNAL OF SCIENCE TECHNOLOGY AND SUSTAINABLE DEVELOPMENT, 2013, 10 (03): : 212 - 228
- [9] Cleaning up the emissions from construction equipment [J]. DIESEL PROGRESS NORTH AMERICAN EDITION, 1999, 65 (03): : 32 - 33