共 50 条
- [1] Best practice simulated annealing for the airline crew scheduling problem [J]. J Heuristics, 4 (419-436):
- [3] The operational airline crew scheduling problem [J]. TRANSPORTATION SCIENCE, 1998, 32 (03) : 232 - 245
- [5] EFFICIENT HEURISTIC SOLUTIONS TO AN AIRLINE CREW SCHEDULING PROBLEM [J]. AIIE TRANSACTIONS, 1979, 11 (02): : 79 - 85
- [6] THE COLUMN GENERATION PRINCIPLE AND THE AIRLINE CREW SCHEDULING PROBLEM [J]. INFOR, 1987, 25 (02) : 136 - 151
- [7] Scheduling Airline Reserve Crew to Minimise Crew Related Delay using Simulated Airline Recovery and a Probabilistic Optimisation Model [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2013), 2013, : 1944 - 1950
- [8] Airline crew-scheduling problem with many irregular flights [J]. ALGORITHMS AND COMPUTATION, PROCEEDINGS, 1997, 1350 : 2 - 11
- [9] COLUMN GENERATION PRINCIPLE AND THE AIRLINE CREW SCHEDULING PROBLEM. [J]. INFOR: Information Systems and Operational Research, 1987, 25 (02): : 136 - 151