Removal of arsenic by pilot-scale vertical flow constructed wetland

被引:0
|
作者
Yaocheng Fan
Tiancui Li
Deshou Cun
Haibing Tang
Yanran Dai
Feihua Wang
Wei Liang
机构
[1] Chinese Academy of Sciences,State Key Laboratory of Freshwater Ecology and Biotechnology, Institute of Hydrobiology
[2] University of Chinese Academy of Sciences,undefined
关键词
Constructed wetland; Arsenic; Removal efficiency; Mass balance;
D O I
暂无
中图分类号
学科分类号
摘要
Four pilot-scale Vertical Flow Constructed Wetlands (VFCWs) filled with gravel and planted with Phragmites australis were operated for seven months in the field to study the efficiency of arsenic removal in contaminated wastewater. The average arsenic removal efficiency by the VFCWs was 52.0%±20.2%, 52.9%±21.3%, and 40.3%±19.4% at the theoretical concentrations of 50 µg/L (CW50), 100 µg/L (CW100), and 500 µg/L (CW500) arsenic in the wastewater, respectively. The results also showed no significant differences in the removal efficiency for conventional contaminants (nitrogen, phosphorus, or chemical oxygen demand) between wastewater treatments that did or did not contain arsenic (P>0.05), except for phosphorus in CW500. The highest average monthly removal rate of arsenic occurred in August (55.9%–74.5%) and the lowest in November (7.8%–15.5%). The arsenic removal efficiency of each VFCW was positively correlated with temperature (P < 0.05). Arsenic accumulated in both substrates and plants, with greater accumulation associated with increased arsenic concentrations in the influent. The maximum accumulated arsenic concentrations in the substrates and plants at the end of the experiment were 4.47 mg/kg and 281.9 mg/kg, respectively, both present in CW500. The translocation factor (TF) of arsenic in the reeds was less than 1, with most of the arsenic accumulating in the roots. The arsenic mass balance indicated that substrate accumulation contributed most to arsenic removal (19.9%–30.4%), with lower levels in plants (3.8%–9.5%). In summary, VFCWs are effective for the treatment of arsenic-containing wastewater.
引用
收藏
相关论文
共 50 条
  • [1] Removal of arsenic by pilot-scale vertical flow constructed wetland
    Fan, Yaocheng
    Li, Tiancui
    Cun, Deshou
    Tang, Haibing
    Dai, Yanran
    Wang, Feihua
    Liang, Wei
    [J]. FRONTIERS OF ENVIRONMENTAL SCIENCE & ENGINEERING, 2021, 15 (04)
  • [2] Removal of arsenic by pilot-scale vertical flow constructed wetland
    Yaocheng Fan
    Tiancui Li
    Deshou Cun
    Haibing Tang
    Yanran Dai
    Feihua Wang
    Wei Liang
    [J]. Frontiers of Environmental Science & Engineering., 2021, 15 (04) - 352
  • [3] Hydraulic characteristics of a pilot-scale vertical subsurface flow constructed wetland
    Zheng, Lei
    Ding, Aizhong
    Kong, Dechuan
    Cheng, Lirong
    [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING (ICEESD2011), PTS 1-5, 2012, 356-360 : 2451 - +
  • [4] Nitrogen removal in a pilot-scale subsurface horizontal flow constructed wetland
    Del Bubba, M
    Lepri, L
    Griffini, O
    Tabani, F
    [J]. ANNALI DI CHIMICA, 2000, 90 (9-10) : 513 - 524
  • [5] Fecal sludge treatment in a pilot-scale vertical-flow constructed wetland for the removal of helminth eggs
    Nzouebet, Wilfried Arsene Letah
    Kengne, Ebenezer Soh
    Rechenburg, Andrea
    Ndangang, Jean-Jules Nana
    Noumsi, Ives Magloire Kengne
    [J]. JOURNAL OF WATER SANITATION AND HYGIENE FOR DEVELOPMENT, 2022, 12 (09) : 634 - 646
  • [6] Modeling organic matter and nitrogen removal from domestic wastewater in a pilot-scale vertical subsurface flow constructed wetland
    Bustillo-Lecompte, Ciro Fernando
    Mehrvar, Mehrab
    Quinones-Bolanos, Edgar
    Fernanda Castro-Faccetti, Claudia
    [J]. JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2016, 51 (05): : 414 - 424
  • [7] Removal of Emerging Pollutants in Horizontal Subsurface Flow and Vertical Flow Pilot-Scale Constructed Wetlands
    Gikas, Georgios D.
    Papaevangelou, Vassiliki A.
    Tsihrintzis, Vassilios A.
    Antonopoulou, Maria
    Konstantinou, Ioannis K.
    [J]. PROCESSES, 2021, 9 (12)
  • [8] Pilot-Scale Removal of Arsenic and Heavy Metals from Mining Wastewater Using Adsorption Combined with Constructed Wetland
    Nguyen, Ha T. H.
    Nguyen, Bien Q.
    Duong, Thuy T.
    Bui, Anh T. K.
    Nguyen, Hang T. A.
    Cao, Ha T.
    Mai, Nhuan T.
    Nguyen, Khai M.
    Pham, Thuy T.
    Kim, Kyoung-Woong
    [J]. MINERALS, 2019, 9 (06):
  • [9] WASTEWATER TREATMENT IN A PILOT-SCALE CONSTRUCTED WETLAND
    Akkoyunlu, Atilla
    Bayhan, Hurrem
    Akiner, Muhammed Ernur
    Erturk, Ferruh
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2015, 24 (12B): : 4589 - 4596
  • [10] Role of Colocasia esculenta L. schott in arsenic removal by a pilot-scale constructed wetland filled with laterite soil
    Thathong, Vanlop
    Tantamsapya, Netnapid
    Yossapol, Chatpet
    Liao, Chih-Hsiang
    Wirojanagud, Wanpen
    Padungthon, Surapol
    [J]. HELIYON, 2019, 5 (02)