An automated health monitoring system for uncoordinated deformation between the metro station side wall and row piles

被引:0
|
作者
Wenhao Fan
Feicong Zhou
Shenghao Xie
Mingfan Zhao
Shumi Deng
Jinyi Li
Ping Zhou
Zhijie Wang
机构
[1] Southwest Jiaotong University,Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering
[2] Sinohydro Bureau 10 Co.,Faculty of Geosciences and Environmental Engineering
[3] Ltd.,undefined
[4] China Railway Eryuan Engineering Group Co.,undefined
[5] Ltd.,undefined
[6] Southwest Jiaotong University,undefined
关键词
Unilateral foundation pit excavation; Metro station structure; Health monitoring; Microwave radar; Uncoordinated deformation;
D O I
暂无
中图分类号
学科分类号
摘要
With the rapid development of urban rail transportation, there is a growing number of projects involving new foundation pits near existing metro stations. One particular risk associated with these projects is the uncoordinated deformation of station structures induced by unilateral excavation, which cannot be detected by current monitoring systems. As a result, this study proposes an innovative automated health monitoring system for assessing the uncoordinated deformation of the existing station side wall and row piles under unilateral excavation conditions. The system employs advanced monitoring equipment, such as microwave radar and laser level deformation monitor, to achieve high-precision, automated, real-time, and all-weather monitoring of structural deformation. By wirelessly and remotely transmitting the monitoring data, the automated analysis is performed to establish the graded safety warning and feedback mechanism for the entire construction cycle. The successful application of this monitoring system has revealed two types of uncoordinated deformation in the station side wall and row piles. Moreover, the uncoordinated deformation of the structure under unilateral excavation can be spatially categorized into three areas: stratigraphic restraint area, shallow excavation area, and deep excavation area. Furthermore, by employing Gaussian distribution fitting on the monitoring data of the entire construction cycle, the station side wall and row piles have been determined to exhibit a high degree of safety. In conclusion, the research findings can realize automated health monitoring, early warning, and feedback of uncoordinated deformation in station structures under unilateral excavation conditions, thereby guiding safe construction practices for multi-line transfer stations.
引用
收藏
页码:1369 / 1389
页数:20
相关论文
共 3 条
  • [1] An automated health monitoring system for uncoordinated deformation between the metro station side wall and row piles
    Fan, Wenhao
    Zhou, Feicong
    Xie, Shenghao
    Zhao, Mingfan
    Deng, Shumi
    Li, Jinyi
    Zhou, Ping
    Wang, Zhijie
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2023, 13 (6-7) : 1369 - 1389
  • [2] Mechanical and deformation characteristics of diaphragm wall system of Beijing metro station
    School of Civil Engineering, Beijing Jiao Tong University, Beijing
    100044, China
    不详
    100068, China
    不详
    100044, China
    Yantu Gongcheng Xuebao, (78-83):
  • [3] Research on the mechanics differences between single-row and double-row side piles of station using the PBA method
    Pei, Xingkai
    Sun, Jing
    Guo, Guangyao
    Zhou, Xuemin
    Zhang, Shuai
    ELECTRONIC JOURNAL OF STRUCTURAL ENGINEERING, 2024, 24 (01): : 33 - 38