Using data mining synergies for evaluating criteria at pre-qualification stage of supplier selection

被引:0
|
作者
Rajeev Jain
A. R. Singh
H. C. Yadav
P. K. Mishra
机构
[1] Kalaniketan Polytechnic College,Mechanical Engineering Department
[2] Motilal Nehru National Institute of Technology,Mechanical Engineering Department
来源
关键词
Supply chain management (SCM); Supplier selection; Supplier’s pre-qualification; Data mining; i-PM algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
A company must purchase a lot of diverse components and raw material from different upstream suppliers to manufacture or assemble its products. Under this situation the supplier selection has become a critical issue for the purchasing department.The selection of suppliers depends on number of criteria and the challenge is to optimize selection process based on critical criteria and select the best supplier(s). During supplier selection process initial screening of potential suppliers from a large set is vital and the determination of prospective supplier is largely dependent on the criteria chosen of such pre-qualification. In the literature, many judgments based methods are proposed and derived criteria selection from the opinion of either the customers or the experts. All these techniques use the knowledge and experience of the decision makers. These methods inherit certain degree of uncertainty due to complex supply chain structure. The extraction of hidden knowledge is one of the most important tools to address such uncertainty and data mining is one such concept to account for such uncertainty and it has been found applicable in many scenarios. The proposed research aims to introduce a data mining approach, to discover the hidden relationships among the supplier’s pre-qualification data with the overall supplier rating that have been derived after observation of previously executed work for a period of time. It provides an overview that how supplier’s initial strength influence its final work performance.
引用
收藏
页码:165 / 175
页数:10
相关论文
共 50 条
  • [1] Using data mining synergies for evaluating criteria at pre-qualification stage of supplier selection
    Jain, Rajeev
    Singh, A. R.
    Yadav, H. C.
    Mishra, P. K.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2014, 25 (01) : 165 - 175
  • [2] Supplier pre-qualification method for the Portuguese construction industry
    Duarte, Beatriz Miguel
    Sousa, Sergio Dinis
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1703 - 1708
  • [3] Analysis of pre-qualification criteria in contractor selection and their impacts on project success
    Doloi, Hemanta
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (12) : 1245 - 1263
  • [4] Contractor selection: a review of qualification and pre-qualification systems
    Acheamfour, V. K.
    Adjei-Kumi, T.
    Kissi, E.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (02) : 338 - 348
  • [5] Establishment of pre-qualification criteria for the selection of subcontractors by the prime constructors for building projects
    Olanrewaju, AbdulLateef
    Bong, Ms Zhi Xun
    Preece, Christopher
    JOURNAL OF BUILDING ENGINEERING, 2022, 45
  • [6] DSS for pre-qualification and selection of construction contractors
    Sylla, C
    Bolunmez, B
    FOURTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS: THE INTERNET ERA & THE GLOBAL ENTERPRISE, VOLS 1 AND 2, 2005, : 379 - 388
  • [7] Ascertaining the impact of contractors pre-qualification criteria on project success criteria
    Acheamfour, Victor Karikari
    Kissi, Ernest
    Adjei-Kumi, Theophilus
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (04) : 618 - 632
  • [8] Review of empirical arguments on contractor pre-qualification criteria
    Acheamfour, Victor Karikari
    Kissi, Ernest
    Adjei-Kumi, Theophilus
    Adinyira, Emmanuel
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (01) : 70 - 83
  • [9] Pre-Qualification of Selecting Construction Project Contractors Using Health and Safety Criteria
    Kukoyi P.O.
    Osuizugbo I.C.
    Yohanna H.S.
    Edike U.E.
    Ohiseghame I.E.
    Journal of Engineering, Project, and Production Management, 2021, 11 (01): : 30 - 36
  • [10] Evaluating Machine Learning and AHP Tools for the Pre-Qualification of Construction Contractors Based on Occupational Health and Safety Criteria
    Assaf, Sena
    Mao, Zeyu
    Momenifar, Samaneh
    Hammad, Ahmed
    CONSTRUCTION RESEARCH CONGRESS 2024: HEALTH AND SAFETY, WORKFORCE, AND EDUCATION, 2024, : 758 - 768