Unrelated parallel-machine scheduling to minimize total weighted completion time

被引:0
|
作者
Jeng-Fung Chen
机构
[1] Feng Chia University,Department of Industrial Engineering and Systems Management
来源
关键词
Record-to-record travel; Setup time; Total weighted completion time; Unrelated parallel machine;
D O I
暂无
中图分类号
学科分类号
摘要
This research deals with the unrelated parallel-machine scheduling to minimize total weighted completion time. There are N\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$N$$\end{document} jobs, each having a weight and requiring a single stage of processing on one of the M\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$M$$\end{document} machines. Because of the attribute and mechanical structure of the machines, the processing time depends on both the job and the machine. A sequence-dependent setup time is required if the type of job scheduled is different from the previous one on the same machine. The required setup time depends on the previous job type, the current job type, and the machine on which the job is processed. Furthermore, the jobs (i.e., orders) from primary customers have rigid due date constraints. In this research, a revised SWPT and improvement procedures are applied to generate a feasible schedule. Three effective heuristics, two based on record-to-record travel (RRT1 and RRT2) and one based on random descent search, are developed to improve the feasible schedule. Computational performance of the proposed heuristics is evaluated through an extensive experiment. Computational results show that RRT1 performs better than the other two heuristics and is able to improve the initial solutions effectively. Computational experiences also indicate that RRT1 is capable of obtaining the optimal solutions for the small-size tested problems very efficiently.
引用
收藏
页码:1099 / 1112
页数:13
相关论文
共 50 条
  • [1] Unrelated parallel-machine scheduling to minimize total weighted completion time
    Chen, Jeng-Fung
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (06) : 1099 - 1112
  • [2] Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
    Li-Yan Wang
    Xue Huang
    Ping Ji
    En-Min Feng
    [J]. Optimization Letters, 2014, 8 : 129 - 134
  • [3] Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
    Wang, Li-Yan
    Huang, Xue
    Ji, Ping
    Feng, En-Min
    [J]. OPTIMIZATION LETTERS, 2014, 8 (01) : 129 - 134
  • [4] Parallel-machine batching and scheduling to minimize total completion time
    Cheng, TCE
    Chen, ZL
    Kovalyov, MY
    Lin, BMT
    [J]. IIE TRANSACTIONS, 1996, 28 (11) : 953 - 956
  • [5] Online Parallel-Machine Scheduling in KRT Environment to Minimize Total Weighted Completion Time
    Li, Wenjie
    Liu, Hailing
    Li, Shisheng
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (04)
  • [6] Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
    Hsu, Chou-Jung
    Cheng, T. C. E.
    Yang, Dar-Li
    [J]. INFORMATION SCIENCES, 2011, 181 (20) : 4799 - 4803
  • [7] Parallel-Machine Scheduling with Step-Deteriorating Jobs to Minimize the Total (Weighted) Completion Time
    Miao, Cuixia
    Kong, Fanyu
    Zou, Juan
    Ma, Ran
    Huo, Yujia
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (01)
  • [8] Note on "Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time"
    Yang, Suh-Jenq
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. INFORMATION SCIENCES, 2014, 260 : 215 - 217
  • [9] Parallel-machine scheduling with simple linear deterioration to minimize total completion time
    Ji, Min
    Cheng, T. C. E.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 188 (02) : 342 - 347
  • [10] Online hierarchical parallel-machine scheduling in shared manufacturing to minimize the total completion time
    Wei, Qi
    Wu, Yong
    Cheng, T. C. E.
    Sun, Fengxin
    Jiang, Yiwei
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 74 (11) : 2432 - 2454