Design and operational issues in AGV-served manufacturing systems

被引:0
|
作者
Tharma Ganesharajah
Nicholas G. Hall
Chelliah Sriskandarajah
机构
来源
关键词
manufacturing, automated guided vehicles, design and operation, survey;
D O I
暂无
中图分类号
学科分类号
摘要
Automated Guided Vehicle (AGV) systems are already in widespread use and their importance for material handling is expected to grow rapidly. The advantages that such systems can offer include increased flexibility, better space utilization, improved factory floor safety, reduction in overall operating cost, and easier interface with other automated systems. This survey paper focuses on design and operational issues that arise in AGV systems. The objectives of the paper are to unify various lines of research related to AGVs and to suggest directions for future study. We consider problems arising in flowpath design, fleet sizing, job and vehicle scheduling, dispatching and conflict-free routing. Flowpath design problems address computationally intractable issues in the physical layout of a single loop and complex networks. Transportation and related models, waiting line analysis and simulation approaches are used to address fleet sizing questions. Scheduling issues focus on three flowpath layouts. In line layouts, the most important issues include finding an efficient job sequencing algorithm and identifying optimal AGV launch times. In loop layouts, issues such as joint scheduling of the job and AGV schedules, interface with a larger manufacturing system, dynamic job arrivals, and the location of the AGV parking area, are important. For complex network layouts, joint scheduling, heuristic dispatching rules, and conflict-free routing of AGVs, are considered. We identify the inefficiencies that result from addressing these issues in isolation, suggesting the need for integration. We also provide a summary of the most important open research issues related to all the above topics.
引用
收藏
页码:109 / 154
页数:45
相关论文
共 50 条
  • [1] Design and operational issues in AGV-served manufacturing systems
    Ganesharajah, T
    Hall, NG
    Sriskandarajah, C
    ANNALS OF OPERATIONS RESEARCH, 1998, 76 (0) : 109 - 154
  • [2] Operational Decisions in AGV-Served Flowshop Loops: Scheduling
    Nicholas G. Hall
    Chelliah Sriskandarajah
    Tharmarajah Ganesharajah
    Annals of Operations Research, 2001, 107 : 161 - 188
  • [3] Operational decisions in AGV-served flowshop loops: Scheduling
    Hall, NG
    Sriskandarajah, C
    Ganesharajah, T
    ANNALS OF OPERATIONS RESEARCH, 2001, 107 (1-4) : 161 - 188
  • [4] Operational Decisions in AGV-Served Flowshop Loops: Fleet Sizing and Decomposition
    Nicholas G. Hall
    Chelliah Sriskandarajah
    Tharmarajah Ganesharajah
    Annals of Operations Research, 2001, 107 : 189 - 209
  • [5] Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition
    Hall, NG
    Sriskandarajah, C
    Ganesharajah, T
    ANNALS OF OPERATIONS RESEARCH, 2001, 107 (1-4) : 189 - 209
  • [6] An Improved Particle Swarm Optimization Algorithm for Integrated Scheduling Model in AGV-Served Manufacturing Systems
    Zhang, Fuqiang
    Li, Jingjing
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2018, 17 (03) : 375 - 390
  • [7] AGV-SERVED ASSEMBLY LINES - INFLUENCE OF SEQUENCING AND LAUNCH POLICIES ON SYSTEM PERFORMANCES
    GRASSO, V
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (07) : 1385 - 1399
  • [8] Operational issues in reconfigurable manufacturing systems: Exception handling
    Bruccoleri, M
    Pasek, ZJ
    ROBOTICS, AUTOMATION AND CONTROL AND MANUFACTURING: TRENDS, PRINCIPLES AND APPLICATIONS, 2002, 14 : 521 - 526
  • [9] The Design of an AGV in the Manufacturing Cell
    Prombanpong, S.
    Kiattiphatthananukul, W.
    Songsanan, A.
    Sukin, A.
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 1006 - 1009
  • [10] Design and operational control of an AGV system
    Mantel, RJ
    Landeweerd, HRA
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) : 257 - 266