共 9 条
- [3] MANAGING THE EMERGENCY: THE CULTURAL HERITAGE RISK CHARTER FOR THE RECOVERY OF WORKS OF ART IN THE EARTHQUAKE-STRICKEN AREAS [J]. ARCHEOMATICA-TECNOLOGIE PER I BENI CULTURALI, 2019, 10 (03): : 28 - 32
- [7] Research on Large Bulk Carrier Hull Production Design Process Planning Based on Dynamic Stiffness Matrix Method [J]. MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 2270 - 2277
- [9] The park process (The master planning of St-Louis's Forest-Park fosters the human-ecosystem design method) [J]. LANDSCAPE ARCHITECTURE, 1998, 88 (01): : 26 - +